FMS REPAIR REQUIREMENT FOR THE UK N00383-25-Q-014A
Summary
AI-generated · Aug 24, 2025Repair of Foreign Military Sales (FMS) items for the UK. Turnaround Time (RTAT) is the time from the asset’s return to the date the asset is accepted under the contract, with return defined as the physical receipt of an F-condition asset at the contractor’s facility as recorded by the Action Date in the CAV system. The contractor must report all transactions by the end of the fifth regular business day after receipt, and the Action Date must reflect the actual receipt date. Final inspection and Government acceptance are required for all assets within the RTATs established in the subsequent contract. RTAT is specified as a number of days after receipt of the asset; a throughput constraint must be provided for each NSN, with total monthly assets to be repaired after initial delivery commenced indicated (X/month) and a placeholder per-month value indicating no constraint if applicable. A reconciliation modification will be issued after final inspection and acceptance of all assets under the subsequent contract. Prices per unit are based on meeting RTAT as shown in the schedule page; if RTAT is not met, consideration will be assessed and negotiated.
Induction Expiration Date is 365 days after contract award; any asset received after this date is not authorized for repair without a bilateral agreement.
This requirement is for the repair of the items herein this solicitation.\\ Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor s facility as reflected in the Action Date entry in the commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. \\ The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.\\\\\\\ Required RTAT: ## ____ days after receipt of asset.\\ Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. \\ Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. \\\\\\\\\\\\\\\ Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral
From Solicitation posted on Jul 14, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA