FMS; Qty: 2, NIIN: 012238125 N0038326QD092
Summary
AI-generated · May 22, 2026Repair and maintenance for FMS asset NIIN 012238125 (2 units) with a fixed Repair Turnaround Time (RTAT) of 298.28 days after receipt. Return is defined as physical receipt of the F-condition asset at the contractor’s facility, as recorded by the Action Date in the CAV system. The contractor must report all asset transactions by the end of the fifth regular business day after receipt, and the Action Date must reflect the actual receipt date. Final inspection and acceptance by the Government must occur within the RTATs established in the subsequent contract. Early and incremental deliveries are accepted and preferred.
Provide a throughput constraint for each NSN, specifying the total assets to be repaired per month after initial delivery begins (a number to be filled in). A throughput value of zero/no constraint is possible with the appropriate entry. Induction Expiration Date is 365 days after award; any asset received after that date is not authorized for repair without bilateral agreement with the NAVSUP WSS Contracting Officer. All contractual documents are considered issued when transmitted by mail, fax, or electronic means, and acceptance of the contractor’s proposal constitutes bilateral agreement to issue such documents.
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 298.28 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT S ACCEPTANCE OF THE CONTRACTOR S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. POC: Jillian Eder Phone: 771-229-0426 E-mail: jillian.a.eder.civ@us.navy.mil
From Solicitation posted on May 21, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA