Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 1 notice 1 document

FMS; Qty: 1; NIIN: 015984368 N0038326QD093

Solicitation N0038326QD093 Copied Notice ID a72f7fa1670b4583b75e6811eae787b8 Copied DEPT OF DEFENSE — NAVSUP WEAPON SYSTEMS SUPPORT
SAM.gov
Posted
May 21, 2026
Deadline
Jun 22, 2026
Set-aside
None
NAICS
334511
PSC
6615

Summary

AI-generated · May 22, 2026

Repairs are required with a fixed RTAT of 310 days measured from asset receipt to government acceptance. Return means the physical receipt of the F-condition asset at the contractor’s facility, as shown by the Action Date in the CAV system. The contractor must report all transactions by the end of the fifth regular business day after receipt, and the Action Date must reflect the actual receipt date. Final inspection and acceptance by the Government must occur within the RTAT. Early and incremental deliveries are accepted and preferred. The contractor must also provide a throughput rate per NSN, indicating total assets to be repaired monthly; if there is no throughput constraint, this must be clearly stated.

Additional requirements include an Induction Expiration Date of 365 days after contract award, after which assets not authorized for repair without a bilateral agreement. All contractual documents are considered issued when transmitted by mail, facsimile, or electronic methods, and acceptance of the contractor’s proposal constitutes a bilateral agreement to issue those documents.

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 310 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT S ACCEPTANCE OF THE CONTRACTOR S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. POC: Jillian Eder Phone: 771-229-0426 E-mail: jillian.a.eder.civ@us.navy.mil

From Solicitation posted on May 21, 2026

Notice history

1
  1. Solicitation LATEST Posted May 21, 2026

Details

Solicitation number N0038326QD093
Notice ID a72f7fa1670b4583b75e6811eae787b8
Notice type Solicitation
Product / Service (PSC) 6615
NAICS 334511
Place of performance Albuquerque, New Mexico
Archive date Jul 30, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Jillian Eder

Email

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSUP
NAVSUP WEAPON SYSTEMS SUPPORT
NAVSUP WSS PHILADELPHIA
NAVSUP WEAPON SYSTEMS SUPPORT

Place of Performance

Albuquerque, New Mexico
USA

Dates

Posted May 21, 2026 2 months ago
Last Updated Aug 06, 2026 2 days ago
Due Jun 22, 2026 1 month ago