FMS Japan Repair, COMPUTER, FLIGHT CON, NIIN 015486318, QTY 1 N00383-26-Q-A064
Summary
AI-generated · Feb 12, 2026Repair of a flight computer unit for a Foreign Military Sales case requires the contractor to perform repairs and adhere to a defined Repair Turnaround Time (RTAT). RTAT is measured from the asset’s return to, and acceptance by, the government, with “return” defined as the physical receipt of a working asset at the contractor’s facility as shown by the Action Date in the asset visibility system. The contractor must report all transactions by the end of the fifth regular business day after receipt, and the Action Date must reflect the actual receipt date. Final inspection and government acceptance must occur within the RTAT.
The contractor must specify a throughput constraint for this NSN, indicating the total number of units that can be repaired monthly after repair operations begin (or indicate that there is no throughput constraint). Prices per unit are fixed as shown in the contract schedule and are based on meeting the RTAT; if the RTAT is not met, pricing may be negotiated. There is an induction period; assets received after the induction expiration require bilateral agreement with the contracting officer to be repaired. A reconciliation modification will be issued after final inspection and acceptance of all assets inducted under the contract.
This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor s facility as reflected in the Action Date entry in the commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
From Solicitation posted on Feb 11, 2026Notice history
1-
Solicitation LATEST Posted Feb 11, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA