Flooring Replacement at Safety Office - Neville Island W911WN25QA027
Summary
AI-generated · Aug 25, 2025Flooring replacement at the Safety Office on Neville Island involves removing the existing flooring, evaluating the subfloor and addressing any condition issues (cleaning or removing tiles as needed), and applying a Super Poly epoxy coating according to the specifications. The contractor must provide all labor, materials, equipment, and supervision to complete the refinishing work at the Safety Office.
The two notices contain identical requirements; there is no change in scope, specifications, or requested work between them.
The requirement is to remove existing flooring, evaluate and address the subfloor condition (clean or remove tile as necessary), and apply a Super Poly epoxy coating in accordance with the provided specifications.The contractor shall furnish all necessary labor, materials, equipment, and supervision to perform the refinishing services at the Safety Office located on Neville Island.
From Combined Synopsis/Solicitation posted on Jun 26, 2025The requirement is to remove existing flooring, evaluate and address the subfloor condition (clean or remove tile as necessary), and apply a Super Poly epoxy coating in accordance with the provided specifications.The contractor shall furnish all necessary labor, materials, equipment, and supervision to perform the refinishing services at the Safety Office located on Neville Island.
From Combined Synopsis/Solicitation posted on Jun 30, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Jun 30, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
15225