Floor Maintenance and Re-surfacing 36C26226Q0051_1
Summary
AI-generated · Jan 14, 2026Provide preventative maintenance and repair services for bathrooms, kitchens, and other wet areas at the Phoenix Veterans Hospital. Work includes pre-restoration tasks before the restoration process, such as removal of floor coatings, caulking, polyurethane, and, where needed, replacement of partitions or work-area impediments; grout sawing when grout depth prevents permanent bonding of glazing compound.
The contractor must identify and include all necessary work to achieve a complete correction of the floors’ condition and appearance. After cleaning, sanitizing, and prepping the floors, apply the SaniGlaze restoration process to protect tile and grout from contamination.
Service Contract to have a Preventative Maintenance and Repair Service for the Bathrooms, Kitchen and wet areas at the Phoenix Veterans Hospital. This project will consist of the following elements but is not limited to these: pre-restoration work necessary before commencement of restoration process steps. Examples include removal of floor coatings/ caulking/polyurethane removal and replacement of partitions or work area impediments, grout sawing in cases where grout depth is insufficient to achieve permanent bonding of glazing compound. Below are some features of work but these are not all inclusive of all work needed to be accomplished on this project. It is the contractor s responsibility to define and capture all work required to give the government a complete correction of the condition and appearance of the Medical Center floors. Contractor will clean, sanitize and prep the floors, followed by the SaniGlaze restoration process that will protect the tile and grout from contamination.
From Solicitation posted on Jan 13, 2026Service Contract to have a Preventative Maintenance and Repair Service for the Bathrooms, Kitchen and wet areas at the Phoenix Veterans Hospital. This project will consist of the following elements but is not limited to these: pre-restoration work necessary before commencement of restoration process steps. Examples include removal of floor coatings/ caulking/polyurethane removal and replacement of partitions or work area impediments, grout sawing in cases where grout depth is insufficient to achieve permanent bonding of glazing compound. Below are some features of work but these are not all inclusive of all work needed to be accomplished on this project. It is the contractor s responsibility to define and capture all work required to give the government a complete correction of the condition and appearance of the Medical Center floors. Contractor will clean, sanitize and prep the floors, followed by the SaniGlaze restoration process that will protect the tile and grout from contamination.
From Solicitation posted on Jan 16, 2026Service Contract to have a Preventative Maintenance and Repair Service for the Bathrooms, Kitchen and wet areas at the Phoenix Veterans Hospital. This project will consist of the following elements but is not limited to these: pre-restoration work necessary before commencement of restoration process steps. Examples include removal of floor coatings/ caulking/polyurethane removal and replacement of partitions or work area impediments, grout sawing in cases where grout depth is insufficient to achieve permanent bonding of glazing compound. Below are some features of work but these are not all inclusive of all work needed to be accomplished on this project. It is the contractor s responsibility to define and capture all work required to give the government a complete correction of the condition and appearance of the Medical Center floors. Contractor will clean, sanitize and prep the floors, followed by the SaniGlaze restoration process that will protect the tile and grout from contamination.
From Solicitation posted on Jan 20, 2026Service Contract to have a Preventative Maintenance and Repair Service for the Bathrooms, Kitchen and wet areas at the Phoenix Veterans Hospital. This project will consist of the following elements but is not limited to these: pre-restoration work necessary before commencement of restoration process steps. Examples include removal of floor coatings/ caulking/polyurethane removal and replacement of partitions or work area impediments, grout sawing in cases where grout depth is insufficient to achieve permanent bonding of glazing compound. Below are some features of work but these are not all inclusive of all work needed to be accomplished on this project. It is the contractor s responsibility to define and capture all work required to give the government a complete correction of the condition and appearance of the Medical Center floors. Contractor will clean, sanitize and prep the floors, followed by the SaniGlaze restoration process that will protect the tile and grout from contamination.
From Solicitation posted on Jan 21, 2026Notice history
4-
Solicitation Posted Jan 13, 2026
-
Solicitation Posted Jan 16, 2026No changes from previous notice
-
Solicitation Posted Jan 20, 2026No changes from previous notice
-
Solicitation LATEST Posted Jan 21, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA