Fire Extinguisher Maintenance FA560626QA008
Summary
AI-generated · Mar 17, 2026Inspect and maintain AMEREX model 775 and 776 1501b flight-line fire extinguishers at Spangdahlem Air Base, Germany, including hydrostatic and ultrasonic testing. Ensure compliance with NFPA 10 to support a 12-year inspection cycle, and provide transport of extinguishers when required. Refer to Attachments 1–7 and the Combined Synopsis/Solicitation for detailed requirements and scope.
Spangdahlem Air Base (GER) has a requirement for Inspection and Maintenance and Hydrostatic/Ultrasonic Testing on AMEREX model 775 and 776 1501b flight-line fire extinguishers The minimum standard of NFPA 10 is required to meet the 12 years inspection cycle. Services shall include transport of the extinguishers when and if required. Please see Attachments 1 through 7, and the Combined Synopsis/Solicitation for a detailed layout of the requirement.
From Combined Synopsis/Solicitation posted on Mar 16, 2026Spangdahlem Air Base (GER) has a requirement for Inspection and Maintenance and Hydrostatic/Ultrasonic Testing on AMEREX model 775 and 776 1501b flight-line fire extinguishers The minimum standard of NFPA 10 is required to meet the 12 years inspection cycle. Services shall include transport of the extinguishers when and if required. Please see Attachments 1 through 7, and the Combined Synopsis/Solicitation for a detailed layout of the requirement.
From Combined Synopsis/Solicitation posted on Mar 27, 2026Spangdahlem Air Base (GER) has a requirement for Inspection and Maintenance and Hydrostatic/Ultrasonic Testing on AMEREX model 775 and 776 1501b flight-line fire extinguishers The minimum standard of NFPA 10 is required to meet the 12 years inspection cycle. Services shall include transport of the extinguishers when and if required. Please see Attachments 1 through 7, and the Combined Synopsis/Solicitation for a detailed layout of the requirement.
From Combined Synopsis/Solicitation posted on Apr 09, 2026Notice history
3-
Combined Synopsis/Solicitation Posted Mar 16, 2026
-
Combined Synopsis/Solicitation Posted Mar 27, 2026No changes from previous notice
-
Combined Synopsis/Solicitation LATEST Posted Apr 09, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Documents
8Contacts
Phone
Phone
Agency
Place of Performance
DEU