Contacts, documents and full notice history are available with a subscription.
Presolicitation NONE Expired 2 notices

Final RFP Geostationary Extended Observations (GeoXO) Lightning Mapper (LMX) Instrument Implementation 80GSFC25CA013

Solicitation 80GSFC25CA013 Copied Notice ID f1cb13832b0843839765923b75042f89 Copied NATIONAL AERONAUTICS AND SPACE ADMINISTRATION — NASA GODDARD SPACE FLIGHT CENTER
SAM.gov
Posted
Aug 26, 2025
Deadline
Sep 10, 2025
Set-aside
NONE
NAICS
336414
PSC
AR14

Summary

AI-generated · Aug 27, 2025

A sole-source modification is planned with Lockheed Martin to deliver a Geostationary Lightning Mapper (LM) flight unit and related services to support NASA GSFC and NOAA’s GeoXO program. The LM will be assembled using existing GLM spare components to ensure compatibility with spacecraft integration timelines and to maintain continuity in national environmental monitoring and severe-weather forecasting.

Scope of work includes assembling one LM instrument from spare sub-assemblies with necessary flight software updates, conducting instrument-level environmental testing, pre-ship review and delivery of qualified flight hardware, and delivering an LM configured for spacecraft integration. It also covers support for spacecraft- and system-level testing, participation in pre-launch testing and launch-site operations, early on-orbit validation, and post-launch calibration. NASA intends to reuse spare components originally manufactured by Lockheed Martin. Because of the instrument’s unique, highly intricate design and the need for specialized manufacturing, test equipment, and expertise, Lockheed Martin is identified as the only qualified vendor. All contract questions must be submitted electronically via email; telephone inquiries are not accepted.

The National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) plans to issue a Sole Source new work Modification to Lockheed Martin for the Geostationary Extended Observations (GeoXO) Lightning Mapper (LMX) contract. This modification is for delivery of a Lightning Mapper (LM) flight unit and associated services, utilizing existing Geostationary Lightning Mapper (GLM) tested spare subsystem components and subsystem units. In support of NOAA s GeoXO Program, NASA GSFC requires delivery of a flight unit and assocated services to ensure compatibility with spacecraft integration timelines and continuity in national environmental monitoring capabilities and severe weather predictions. LM operational data that will be used by National Oceanic and Atmoshperic Administration (NOAA) and other public and private agencies to produce forecasts of severe weather and to issue warnings for public safety. Required efforts include: Assemble and deliver one LM instrument utilizing existing spare sub-assembly units, including any needed flight software updates Conduct instrument-level environmental testing Execute pre-ship review and delivery of qualified flight hardware by 2030 Provide documentation and data packages in accordance with contract requirements Deliver LM configured for spacecraft integration Support spacecraft-level integration and system testing Participate in pre-launch testing and launch site operations Support launch operations and early on-orbit validation Conduct post-launch calibration to confirm operational performance NASA intends to reuse spare components originally manufactured and qualified by Lockheed Martin. Based on the unique and highly intricate design of the Lightning Mapper instrument, along with required precision manufacturing processes, special test equipment, test fixtures, specialized and skilled workforce, in-depth calibration procedures, and institutional expertise and knowledge required to provide the LM by April 2030, Lockheed Martin is the only qualified vendor that meets the requirements for this procurement. All contractual and technical questions must be submitted electronically via email to Kelly.r.lytton@nasa.gov no later than 15 days from posting date. Telephone questions will not be accepted.

From Presolicitation posted on Aug 26, 2025

The National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) plans to issue a Sole Source new work Modification to Lockheed Martin for the Geostationary Extended Observations (GeoXO) Lightning Mapper (LMX) contract. This modification is for delivery of a Lightning Mapper (LM) flight unit and associated services, utilizing existing Geostationary Lightning Mapper (GLM) tested spare subsystem components and subsystem units. In support of NOAA s GeoXO Program, NASA GSFC requires delivery of a flight unit and assocated services to ensure compatibility with spacecraft integration timelines and continuity in national environmental monitoring capabilities and severe weather predictions. LM operational data that will be used by National Oceanic and Atmoshperic Administration (NOAA) and other public and private agencies to produce forecasts of severe weather and to issue warnings for public safety. Required efforts include: Assemble and deliver one LM instrument utilizing existing spare sub-assembly units, including any needed flight software updates Conduct instrument-level environmental testing Execute pre-ship review and delivery of qualified flight hardware by 2030 Provide documentation and data packages in accordance with contract requirements Deliver LM configured for spacecraft integration Support spacecraft-level integration and system testing Participate in pre-launch testing and launch site operations Support launch operations and early on-orbit validation Conduct post-launch calibration to confirm operational performance NASA intends to reuse spare components originally manufactured and qualified by Lockheed Martin. Based on the unique and highly intricate design of the Lightning Mapper instrument, along with required precision manufacturing processes, special test equipment, test fixtures, specialized and skilled workforce, in-depth calibration procedures, and institutional expertise and knowledge required to provide the LM by April 2030, Lockheed Martin is the only qualified vendor that meets the requirements for this procurement. All contractual and technical questions must be submitted electronically via email to Kelly.r.lytton@nasa.gov no later than 15 days from posting date. Telephone questions will not be accepted.

From Presolicitation posted on Aug 27, 2025

Notice history

2
  1. Presolicitation Posted Aug 26, 2025
  2. Presolicitation LATEST Posted Aug 27, 2025
    • Title: Final RFP Geostationary Extended Observations (GeoXO) Lightning Mapper (LMX) Instrument ImplementationJustification for Other than Full and Open Competition – GeoXO LMX Instrument Implementation Using GLM Heritage Hardware spares

Details

Solicitation number 80GSFC25CA013
Notice ID f1cb13832b0843839765923b75042f89
Notice type Presolicitation
Product / Service (PSC) AR14
NAICS 336414
Set-aside No Set aside used
Place of performance Sunnyvale, California
Archive date Sep 25, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Kelly R Lytton

Email

Phone

Agency

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
NASA GODDARD SPACE FLIGHT CENTER

Place of Performance

Sunnyvale, California
USA

Dates

Posted Aug 26, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 10, 2025 10 months ago