Fiber Optic Cable B230 to B9511 FA302226Q0009
Summary
AI-generated · May 27, 2026Engineer, furnish, install and test 12-strand single-mode fiber optic cable from ITB 230 to Building 9511 at Columbus AFB, MS. Install about 3,100 feet of 12-strand SM FOC, terminating the cable in a 12-port FODP at ITB 230 and in an outdoor FODP at B9511, including the maintenance loop.
A pre-bid site visit is scheduled. Meet at the Main Gate Visitors Center and proceed to the site; inspecting the site is encouraged to gauge conditions and potential costs, but not inspecting will not be grounds for a claim after award. To participate, provide the required Base Access Procedures information, and respond by the specified deadline. After reviewing the CUI training slides and signing the CUI safeguard document, you may request the EAL.
Engineer, furnish, install and test (EFI&T) 12-strand single mode (SM) fiber optic cables (FOC) from Infrastructure Transfer Building (ITB) 230 to Building (B) 9511 at Columbus AFB, MS. The Contractor shall install approximately 3,100 feet (maintenance loop included) of 12-strand SM FOC from ITB 230 to B9511. Terminate 12 strand SM FOC in the new 12-port FODP in ITB 230, and outdoor FODP in B9511. A site visit will be held on 2 June, 2026 at 10:00 AM CST. Vendors shall meet at the Main Gate Visitors Center, 108 Simler Blvd, Columbus AFB, MS, 39710. Vendors will then walk/drive to the actual site of contract performance. Vendors are encouraged to inspect the site in order to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance to the extent that information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Those wishing to participate in the site visit shall provide all information specified in the attached Base Access Procedures. Site visit attendees shall respond no later than 28 May, 2026 at 2:00 PM CST. Once you have reviewed the CUI Training slides, sign the CUI Safeguard document and return to both 2d Lt. Jackson Basil and TSgt Micah-James Carley. Once you have completed these items, you may request the EAL.
From Solicitation posted on May 26, 2026Engineer, furnish, install and test (EFI&T) 12-strand single mode (SM) fiber optic cables (FOC) from Infrastructure Transfer Building (ITB) 230 to Building (B) 9511 at Columbus AFB, MS. The Contractor shall install approximately 3,100 feet (maintenance loop included) of 12-strand SM FOC from ITB 230 to B9511. Terminate 12 strand SM FOC in the new 12-port FODP in ITB 230, and outdoor FODP in B9511. A site visit will be held on 2 June, 2026 at 10:00 AM CST. Vendors shall meet at the Main Gate Visitors Center, 108 Simler Blvd, Columbus AFB, MS, 39710. Vendors will then walk/drive to the actual site of contract performance. Vendors are encouraged to inspect the site in order to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance to the extent that information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Those wishing to participate in the site visit shall provide all information specified in the attached Base Access Procedures. Site visit attendees shall respond no later than 28 May, 2026 at 2:00 PM CST. Once you have reviewed the CUI Training slides, sign the CUI Safeguard document and return to both 2d Lt. Jackson Basil and TSgt Micah-James Carley. Once you have completed these items, you may request the EAL. Amendment 0003 issued 4 June 2026. SOW drawing page added. Q&A date and quote due date amended.
From Solicitation posted on Jun 04, 2026Notice history
2-
-
Solicitation LATEST Posted Jun 04, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jun 12, 2026 → Jun 16, 2026
Details
Award Information
Not yet awarded
Documents
9Contacts
Phone
Phone
Agency
Place of Performance
USA