Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 4 notices 27 documents

Fermilab-Construction Services for IERC CCD Space Humidificaion-372698 372698_DG

Solicitation 372698_DG Copied Notice ID ac2ee79b3e554faeb73d267820946571 Copied ENERGY, DEPARTMENT OF — FERMILAB - DOE CONTRACTOR
SAM.gov
Posted
Dec 02, 2025
Deadline
Jan 07, 2026
Set-aside
None
NAICS
238220
PSC
4120

Summary

AI-generated · Dec 03, 2025

Provide all supervision, labor, materials, tools, equipment, and related items necessary to diligently and fully perform all work described in the drawings and technical specifications for the IERC CCD Space Humidification project. The work includes transportation, overhead, bonding costs, safety oversight, quality-control oversight, and the supervision required to construct the project per the drawings and technical specifications.

The Subcontractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications.

From Solicitation posted on Dec 02, 2025

The Subcontractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications.

From Solicitation posted on Jan 06, 2026

The Subcontractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications.

From Solicitation posted on Jan 29, 2026

The Subcontractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications.

From Solicitation posted on Feb 06, 2026

Notice history

4
  1. Solicitation Posted Dec 02, 2025
  2. Solicitation Posted Jan 06, 2026
    • Response Deadline: Jan 07, 2026Jan 12, 2026
  3. Solicitation Posted Jan 29, 2026
    • Response Deadline: Jan 12, 2026Feb 09, 2026
  4. Solicitation LATEST Posted Feb 06, 2026
    No changes from previous notice

Details

Solicitation number 372698_DG
Notice ID ac2ee79b3e554faeb73d267820946571
Notice type Solicitation
Product / Service (PSC) 4120
NAICS 238220
Place of performance Illinois
Archive date Jan 22, 2026

Award Information

Not yet awarded