Contacts, documents and full notice history are available with a subscription.
Sources Sought Expired 1 notice 1 document

FCI Jesup - Water main tie-into water softener 15B30725PR000102

Solicitation 15B30725PR000102 Copied Notice ID 398bdb510473418ba6ea84e68c2449ba Copied JUSTICE, DEPARTMENT OF — FAO
SAM.gov
Posted
Jul 25, 2025
Deadline
Aug 04, 2025
Set-aside
None
NAICS
237110
PSC
Z2FF

Summary

AI-generated · Aug 24, 2025

Market research is underway to identify a responsible firm capable of providing all labor, materials, and equipment needed to tap into the existing 12-inch ductile iron water main and feed a new water softener system at FCI Jesup. The scope includes excavating around the check valve vault to expose the 12" main, installing a 12" valve upstream of the check valve, creating underground tie-ins for a 6" supply and a 6" return on the 12" main, penetrating through the building wall, and routing a 6" line to the water softener; the main will be reduced from 12" to 6" as part of the installation. Drawings in the Statement of Work illustrate the layout.

All work must comply with local, state, and federal regulations; drawings will be provided to show the layout, and a single solicitation will be issued to acquire the services and materials.

The Federal Bureau of Prisons is conducting market research in accordance with the Federal Acquisition Regulation, Part 10. A single solicitation will be issued for the Water main Tie-In to the existing centralized water softener system. The Federal Bureau of Prisons (FBOP), FCI Jesup, is a federal correctional facility located at 2600 Highway 301 South, Jesup, GA 31599. The FBOP intends to award to a responsible entity for the provision of all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and install a 6-inch line to the existing water softener system. See SOW for drawings for further details. All work must comply with local, state, and federal regulations. Drawings will be provided to show the layout of the work area.

From Sources Sought posted on Jul 25, 2025

Notice history

1
  1. Sources Sought LATEST Posted Jul 25, 2025

Details

Solicitation number 15B30725PR000102
Notice ID 398bdb510473418ba6ea84e68c2449ba
Notice type Sources Sought
Product / Service (PSC) Z2FF
NAICS 237110
Place of performance Jesup, Georgia
Archive date Sep 30, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Steven Dennison

Email

Phone

Agency

JUSTICE, DEPARTMENT OF
FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
FAO

Place of Performance

Jesup, Georgia 31599
USA

Dates

Posted Jul 25, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 04, 2025 1 year ago