Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 5 notices 6 documents

Fall Protection System W50S6V26Q0002

Solicitation W50S6V26Q0002 Copied Notice ID d096c90687104573b08dea4410e3fff0 Copied DEPT OF DEFENSE — W7MY USPFO ACTIVITY COANG 140
SAM.gov
Posted
Apr 15, 2026
Deadline
Apr 27, 2026
Set-aside
SBA
NAICS
333923
PSC
3950

Summary

AI-generated · Mar 21, 2026

Acquire and install a permanent overhead fall protection system in the Refueling Maintenance bay to protect mechanics working on top of R-11 refueler trucks and other tall vehicles, where work surfaces exceed 10 feet above the concrete floor. The system must be engineered and installed overhead to provide a compliant, safe working environment and mitigate fall hazards.

This is required to meet AFI 91-203 and OSHA safety standards; the current configuration lacks a compliant system, creating unacceptable risk that could impact mission performance, including potential loss of skilled technicians and safety shutdowns. The installation is a fundamental safety obligation, not an enhancement. Review the solicitation attachments and follow all instructions precisely, as failure to do so will render quotes unresponsive.

The 140th Logistics Readiness Squadron, Vehicle Management Flight (140 LRS/LGRV) at Buckley Space Force Base requires the acquisition and installation of a permanent, overhead fall protection system for the Refueling Maintenance (RFM) bay. This system is essential to provide a safe and compliant working environment for mechanics performing maintenance on R-11 refueler trucks and other high-profile vehicles. Refueling Maintenance mechanics are routinely required to work on the top deck of R-11 refueler trucks to service vents, manifolds, and other components. This work surface is at a height exceeding 10 feet above a concrete floor, presenting a significant fall hazard. To achieve compliance with established safety standards, AFI 91-203, Air Force Consolidated Safety Standard, and Occupational Safety and Health Administration (OSHA) regulations mandate the use of an engineered fall protection system to mitigate the risk of serious injury or death in such circumstances. The current facility configuration lacks a compliant system, creating an unacceptable risk to personnel. The absence of a compliant fall protection system directly impacts the mission by creating an unsafe working condition that could result in a serious mishap. A fall-related incident would lead to the loss of a skilled technician, a unit safety stand-down, and a subsequent degradation of the 140th Wing's aircraft refueling capabilities. The installation of a permanent, engineered system is not an enhancement but a fundamental requirement to ensure the safe and uninterrupted execution of the vehicle maintenance mission and to meet all legal and regulatory safety obligations. Please review the solicitiation attachements and follow instructions. Failure to follow provided instructions will make vendors quote be considered unresponsive.

From Combined Synopsis/Solicitation posted on Mar 20, 2026

The 140th Logistics Readiness Squadron, Vehicle Management Flight (140 LRS/LGRV) at Buckley Space Force Base requires the acquisition and installation of a permanent, overhead fall protection system for the Refueling Maintenance (RFM) bay. This system is essential to provide a safe and compliant working environment for mechanics performing maintenance on R-11 refueler trucks and other high-profile vehicles. Refueling Maintenance mechanics are routinely required to work on the top deck of R-11 refueler trucks to service vents, manifolds, and other components. This work surface is at a height exceeding 10 feet above a concrete floor, presenting a significant fall hazard. To achieve compliance with established safety standards, AFI 91-203, Air Force Consolidated Safety Standard, and Occupational Safety and Health Administration (OSHA) regulations mandate the use of an engineered fall protection system to mitigate the risk of serious injury or death in such circumstances. The current facility configuration lacks a compliant system, creating an unacceptable risk to personnel. The absence of a compliant fall protection system directly impacts the mission by creating an unsafe working condition that could result in a serious mishap. A fall-related incident would lead to the loss of a skilled technician, a unit safety stand-down, and a subsequent degradation of the 140th Wing's aircraft refueling capabilities. The installation of a permanent, engineered system is not an enhancement but a fundamental requirement to ensure the safe and uninterrupted execution of the vehicle maintenance mission and to meet all legal and regulatory safety obligations. Please review the solicitiation attachements and follow instructions. Failure to follow provided instructions will make vendors quote be considered unresponsive. ---------------------------------------------------------------------------------------------- AMENDMENT 001 - The purpose of this amendment is to update the Base Access Form (attachment 4) to the most current version the base is using, CAO 25 March 2026.

From Combined Synopsis/Solicitation posted on Mar 25, 2026

The 140th Logistics Readiness Squadron, Vehicle Management Flight (140 LRS/LGRV) at Buckley Space Force Base requires the acquisition and installation of a permanent, overhead fall protection system for the Refueling Maintenance (RFM) bay. This system is essential to provide a safe and compliant working environment for mechanics performing maintenance on R-11 refueler trucks and other high-profile vehicles. Refueling Maintenance mechanics are routinely required to work on the top deck of R-11 refueler trucks to service vents, manifolds, and other components. This work surface is at a height exceeding 10 feet above a concrete floor, presenting a significant fall hazard. To achieve compliance with established safety standards, AFI 91-203, Air Force Consolidated Safety Standard, and Occupational Safety and Health Administration (OSHA) regulations mandate the use of an engineered fall protection system to mitigate the risk of serious injury or death in such circumstances. The current facility configuration lacks a compliant system, creating an unacceptable risk to personnel. The absence of a compliant fall protection system directly impacts the mission by creating an unsafe working condition that could result in a serious mishap. A fall-related incident would lead to the loss of a skilled technician, a unit safety stand-down, and a subsequent degradation of the 140th Wing's aircraft refueling capabilities. The installation of a permanent, engineered system is not an enhancement but a fundamental requirement to ensure the safe and uninterrupted execution of the vehicle maintenance mission and to meet all legal and regulatory safety obligations. Please review the solicitiation attachements and follow instructions. Failure to follow provided instructions will make vendors quote be considered unresponsive. ---------------------------------------------------------------------------------------------- AMENDMENT 001 - The purpose of this amendment is to update the Base Access Form (attachment 4) to the most current version the base is using, CAO 25 March 2026.

From Combined Synopsis/Solicitation posted on Mar 26, 2026

The 140th Logistics Readiness Squadron, Vehicle Management Flight (140 LRS/LGRV) at Buckley Space Force Base requires the acquisition and installation of a permanent, overhead fall protection system for the Refueling Maintenance (RFM) bay. This system is essential to provide a safe and compliant working environment for mechanics performing maintenance on R-11 refueler trucks and other high-profile vehicles. Refueling Maintenance mechanics are routinely required to work on the top deck of R-11 refueler trucks to service vents, manifolds, and other components. This work surface is at a height exceeding 10 feet above a concrete floor, presenting a significant fall hazard. To achieve compliance with established safety standards, AFI 91-203, Air Force Consolidated Safety Standard, and Occupational Safety and Health Administration (OSHA) regulations mandate the use of an engineered fall protection system to mitigate the risk of serious injury or death in such circumstances. The current facility configuration lacks a compliant system, creating an unacceptable risk to personnel. The absence of a compliant fall protection system directly impacts the mission by creating an unsafe working condition that could result in a serious mishap. A fall-related incident would lead to the loss of a skilled technician, a unit safety stand-down, and a subsequent degradation of the 140th Wing's aircraft refueling capabilities. The installation of a permanent, engineered system is not an enhancement but a fundamental requirement to ensure the safe and uninterrupted execution of the vehicle maintenance mission and to meet all legal and regulatory safety obligations. Please review the solicitiation attachements and follow instructions. Failure to follow provided instructions will make vendors quote be considered unresponsive. ---------------------------------------------------------------------------------------------- AMENDMENT 001 - The purpose of this amendment is to update the Base Access Form (attachment 4) to the most current version the base is using, CAO 25 March 2026. ---------------------------------------------------------------------------------------------- AMENDMENT 002 - The purpose of this amendment is to update the Base Access Form (attachment 4) response date to 8 April 2026.

From Combined Synopsis/Solicitation posted on Apr 08, 2026

The 140th Logistics Readiness Squadron, Vehicle Management Flight (140 LRS/LGRV) at Buckley Space Force Base requires the acquisition and installation of a permanent, overhead fall protection system for the Refueling Maintenance (RFM) bay. This system is essential to provide a safe and compliant working environment for mechanics performing maintenance on R-11 refueler trucks and other high-profile vehicles. Refueling Maintenance mechanics are routinely required to work on the top deck of R-11 refueler trucks to service vents, manifolds, and other components. This work surface is at a height exceeding 10 feet above a concrete floor, presenting a significant fall hazard. To achieve compliance with established safety standards, AFI 91-203, Air Force Consolidated Safety Standard, and Occupational Safety and Health Administration (OSHA) regulations mandate the use of an engineered fall protection system to mitigate the risk of serious injury or death in such circumstances. The current facility configuration lacks a compliant system, creating an unacceptable risk to personnel. The absence of a compliant fall protection system directly impacts the mission by creating an unsafe working condition that could result in a serious mishap. A fall-related incident would lead to the loss of a skilled technician, a unit safety stand-down, and a subsequent degradation of the 140th Wing's aircraft refueling capabilities. The installation of a permanent, engineered system is not an enhancement but a fundamental requirement to ensure the safe and uninterrupted execution of the vehicle maintenance mission and to meet all legal and regulatory safety obligations. Please review the solicitiation attachements and follow instructions. Failure to follow provided instructions will make vendors quote be considered unresponsive. ---------------------------------------------------------------------------------------------- AMENDMENT 001 - The purpose of this amendment is to update the Base Access Form (attachment 04) to the most current version the base is using, CAO 25 March 2026. ---------------------------------------------------------------------------------------------- AMENDMENT 002 - The purpose of this amendment is to update the Base Access Form (attachment 04) response date to 8 April 2026. ---------------------------------------------------------------------------------------------- AMENDMENT 003 - The purpose of this amendment is to make minor changes to the salient characteristics (attachment 02)

From Combined Synopsis/Solicitation posted on Apr 15, 2026

Notice history

5
  1. Combined Synopsis/Solicitation Posted Mar 20, 2026 View
  2. Combined Synopsis/Solicitation Posted Mar 25, 2026
    • Description: Description was updated
  3. Combined Synopsis/Solicitation Posted Mar 26, 2026
    No changes from previous notice
  4. Combined Synopsis/Solicitation Posted Apr 08, 2026
    • Description: Description was updated
  5. Combined Synopsis/Solicitation LATEST Posted Apr 15, 2026
    • Description: Description was updated

Details

Solicitation number W50S6V26Q0002
Notice ID d096c90687104573b08dea4410e3fff0
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 3950
NAICS 333923
Place of performance Colorado
Archive date May 12, 2026

Award Information

Not yet awarded

Contacts

primary
140th Contracting Office

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
JFHQ USPFO CO
USPFO CO PROCUREMENT
W7MY USPFO ACTIVITY COANG 140

Place of Performance

Colorado 80011
USA

Dates

Posted Apr 15, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 27, 2026 3 months ago