Fabricate and Install New Structural Steel Flooring System at the Watervliet Arsenal, NY W911PT26QA066
Summary
AI-generated · Apr 24, 2026Provide design, materials, fabrication, installation, assembly, erection, inspection, quality control, and testing of a new structural steel flooring system to support manufacturing equipment in Building 35 at Watervliet Arsenal. All work must follow the specified Statement of Work (Section J) and applicable wage determinations (NY2 Latest Revision). The project is a firm-fixed-price effort with an estimated value between $25,000 and $100,000, and a period of performance of 90 days from notice to proceed. Bonding requirements include 100% payment bonds, with 100% performance bonds required if the price exceeds $150,000.
A site visit will be held to review the scope and site conditions; check the solicitation for details on scheduling and attendance.
Contractor to provide the design, materials, installation, workmanship, fabrication, assembly, erection, inspection, quality control, and testing of a new structural steel flooring system required to support manufacturing equipment in Building 35 at the Watervliet Arsenal (WVA). All work to be conducted in accordance with the Statement of Work (see section J of the solicitation). Wage Determination General Decision Number: NY2 Latest Reviison applies and is incorporated. Magnitude of the project is between $25,000 and $100,000. Period of performance is 90 days from issuance of Notice to Proceed. 100% Payment (and Performance if price is over $150k) bonds are required. Solicitation is set-aside for small business and will result in a firm fixed-price contract. Site visit will be conducted on 28 April 2026 @ 2:00pm. See page 3 of solicitation for further details.
From Solicitation posted on Apr 23, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA