FAA Western & Central Facility Demolition, Removal and Restoration 6913G626R200004
Summary
AI-generated · Apr 11, 2026Demolition, remediation/removal, and restoration work at FAA Western & Central facilities involves removing environmental hazards and on-site structures, then restoring disturbed areas before relinquishing the properties. If a facility is leased and has no co-located sites, leases will typically be canceled after demolition and restoration; if government-owned, the property may be sold or repurposed. The DEN TANK area within an active FAA complex will only have the former tank and related infrastructure removed.
Contractors must perform all work under applicable federal, state, and local requirements, following the most stringent rule when conflicts exist. A draft Demolition, Removal, and Restoration Work Plan must be submitted within 10 business days after a kickoff with Volpe Center representatives, outlining the technical approach, schedule, and all demolition, debris removal, disposal, and site restoration activities, using the government-furnished site surveys. The contractor will obtain all necessary local, state, and federal permits and include them as an appendix to the work plan. Environmental surveys found no asbestos-containing materials; no lead in soil above action levels at RVS and TJY; lead-based paint was not found on building materials, though orange-painted antennas at RVS and TJY were not sampled and are presumed to contain LBP and shall be disposed accordingly. The work must follow the site surveys and the approved Final Work Plans for removing structures and infrastructure.
The FAA no longer uses the equipment/buildings at the above-listed facilities. If the property is leased and there are no co-located facilities, the FAA will typically cancel the leases after the demolition and restoration activities take place. If the property is government-owned, the FAA will either sell the property or repurpose it for further government use. Prior to relinquishing these properties the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas. The DEN TANK is co-located at an active FAA facility complex and only the former tank and related infrastructure is being removed from the property. TASKS TO BE PERFORMED The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. Demolition, Remediation/Removal, and Restoration Work Plan The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey reports for the facilities scheduled for demolition. The contractor shall remove and/or demolish on-site structures and infrastructure in accordance with the procedures detailed in the site survey reports and the approved Final Work Plans. The contractor shall obtain all necessary local, state and federal permits for demolition work, complete any required paperwork, and pay any applicable fees unless otherwise discussed with the Government. These permits shall be submitted as an appendix to the work plan unless previously discussed with the Volpe Center. Asbestos, lead-based paint (LBP) and PCB in building materials surveys were completed by licensed inspectors. The results are included as government furnished information (GFI). No asbestos-containing materials (ACM) were found at all three FAA facilities. Lead was not found in the soil above the FAA action level of 200 mg/kg at RVS and TJY OMs. LBP was not found on building materials, however, the orange-painted OM antennas at RVS and TJY were not sampled, and based on similar FAA projects, are presumed to contain LBP and shall be disposed as such. (SEE SOLICITATION for details)
From Combined Synopsis/Solicitation posted on Apr 10, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA