Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation NONE Expired 4 notices 4 documents

FAA - Target Generation Facility Computer Servers 692M15-26-P-00007

Solicitation 692M15-26-P-00007 Copied Notice ID 3184ad3ef6c24d9697bc63c15e3c4fee Copied TRANSPORTATION, DEPARTMENT OF — FAA WILLIAM J HUGHES TECHNICAL CENT
SAM.gov
Posted
Feb 06, 2026
Deadline
Feb 20, 2026
Set-aside
NONE
NAICS
334112
PSC
7B22

Summary

AI-generated · Feb 07, 2026

14 computer servers to replace outdated equipment at the Target Generation Facility. Quotes must strictly comply with the attached specifications; refurbished equipment will not be accepted, and quotes not adhering to the specs will be disregarded.

Review the attached AMS Clauses and Draft Purchase Order; alternate standard commercial terms and conditions will not be accepted, and quotes must not include commercial terms. For any questions, use the contact listed in the posting.

The Federal Aviation Administration's (FAA) Target Generation Facility (TGF) requires 14 Computer Servers to replace outdated equipment. Attachments to this posting are as follows: 1 - Specifications (1 attachment) (quotes must be compliant with the specs listed.Quotes not adhering to the specifications will be disregarded. Refurbished equipment will not be accepted. 2 - AMS Clauses and Draft Purchase Order (3 Attachments) - Alternate "standard commercial terms and conditions" will not be accepted. Please do not mark quotes with commercial terms and conditions. Please direct all questions to Kevin Smith at 609-485-4574, or kevin.p.smith@faa.gov.

From Combined Synopsis/Solicitation posted on Feb 06, 2026

2/10/2026: The following three (3) questions and answers are being posted to clarify the requirement. 1) How much total memory are you needing per node? Answer: Total Memory is Per unit/computer The required RAM memory per the spec is 128GB DDR5-6400 ECC Registered 288-Pin SDRAM Quality Burn-in Certified by @Xi Req. 8+ DIMM MDB, 2+ CPU, max RAM speed CPU & load dependent and only for AMD & Xeon with DDR5 support as noted. Requires Rackmount with adequate ventilation.) 2) Can we use SAVES? Answer: Market Research was conducted via SAVES and the requirement was either not bid or the response was inadequate (missing specs) to determine compatibility with the requirement. This is being competed full and open. 3) Could you please confirm whether this request is brand-specific or if equivalent/ comparable specs are acceptable? If equivalents are allowed, please let us know if alternatives that meet or exceed the spec sheet requirements would be considered. Additionally, could you confirm the quantities for each line item (e.g., hard drives, memory, CPUs)? Answer: Neither the completed server, nor any of the components are brand specific; they are available and used by many computer manufactures to build complete computer systems in the commercial markets. Any component chosen must meet the minimum stated performance of the processor in GHz speeds; the bus speeds in MHz; and drive speeds in MB/s. This includes, but limited to, the motherboard, processor and cache, drives, RAM and all supporting components. A complete list of specifications and performance curves must be provided with your Quote for review and comparison by the FAA against the list of requirements. Manufacturer Support, Points of Contact must be provided with your Quote for confirmation of the provided specifications in the event component performance cannot be determined by the list of proposed specifications.The requirement is for (14) complete systems. The components provided in the Specs are commercially available to any supplier for these (14) complete systems. (1) of each component on the requirements list is required to complete (1) system for a total of (14) systems. _____________________________________________________________________________________________________ Original Post: The Federal Aviation Administration's (FAA) Target Generation Facility (TGF) requires 14 Computer Servers to replace outdated equipment. Attachments to this posting are as follows: 1 - Specifications (1 attachment) (quotes must be compliant with the specs listed.Quotes not adhering to the specifications will be disregarded. Refurbished equipment will not be accepted. 2 - AMS Clauses and Draft Purchase Order (3 Attachments) - Alternate "standard commercial terms and conditions" will not be accepted. Please do not mark quotes with commercial terms and conditions. Please direct all questions to Kevin Smith at 609-485-4574, or kevin.p.smith@faa.gov.

From Combined Synopsis/Solicitation posted on Feb 10, 2026

2/12/2026: the additional four (4) questions and answers (numbered 4-7) are being posted to clarify the requirement. 4) Can you confirm what specific drives you plan on using for the servers? Answer: 4th paragraph down in the spec .1 solid state memory drive. 5) I wanted to confirm if this will be purchased through SAVES or not? Answer: This will not be purchased through SAVES 6) Could you please confirm whether this request is brand-specific or if equivalent/ comparable specs are acceptable? If equivalents are allowed, please let us know if alternatives that meet or exceed the spec sheet requirements would be considered. Answer: This is not brand name specific. Equivalents that meet or exceed the spec are allowed but bear in mind this is essentially low price technically acceptable with technical acceptability defined by the specifications. 7) Additionally, could you confirm the quantities for each line item (e.g., hard drives, memory, CPUs)? Answer: See the response to question 3 posted on 2/10. _______________________________________________________________________________________________ 2/10/2026: The following three (3) questions and answers are being posted to clarify the requirement. 1) How much total memory are you needing per node? Answer: Total Memory is Per unit/computer The required RAM memory per the spec is 128GB DDR5-6400 ECC Registered 288-Pin SDRAM Quality Burn-in Certified by @Xi Req. 8+ DIMM MDB, 2+ CPU, max RAM speed CPU & load dependent and only for AMD & Xeon with DDR5 support as noted. Requires Rackmount with adequate ventilation.) 2) Can we use SAVES? Answer: Market Research was conducted via SAVES and the requirement was either not bid or the response was inadequate (missing specs) to determine compatibility with the requirement. This is being competed full and open. 3) Could you please confirm whether this request is brand-specific or if equivalent/ comparable specs are acceptable? If equivalents are allowed, please let us know if alternatives that meet or exceed the spec sheet requirements would be considered. Additionally, could you confirm the quantities for each line item (e.g., hard drives, memory, CPUs)? Answer: Neither the completed server, nor any of the components are brand specific; they are available and used by many computer manufactures to build complete computer systems in the commercial markets. Any component chosen must meet the minimum stated performance of the processor in GHz speeds; the bus speeds in MHz; and drive speeds in MB/s. This includes, but limited to, the motherboard, processor and cache, drives, RAM and all supporting components. A complete list of specifications and performance curves must be provided with your Quote for review and comparison by the FAA against the list of requirements. Manufacturer Support, Points of Contact must be provided with your Quote for confirmation of the provided specifications in the event component performance cannot be determined by the list of proposed specifications.The requirement is for (14) complete systems. The components provided in the Specs are commercially available to any supplier for these (14) complete systems. (1) of each component on the requirements list is required to complete (1) system for a total of (14) systems. _____________________________________________________________________________________________________ Original Post: The Federal Aviation Administration's (FAA) Target Generation Facility (TGF) requires 14 Computer Servers to replace outdated equipment. Attachments to this posting are as follows: 1 - Specifications (1 attachment) (quotes must be compliant with the specs listed.Quotes not adhering to the specifications will be disregarded. Refurbished equipment will not be accepted. 2 - AMS Clauses and Draft Purchase Order (3 Attachments) - Alternate "standard commercial terms and conditions" will not be accepted. Please do not mark quotes with commercial terms and conditions. Please direct all questions to Kevin Smith at 609-485-4574, or kevin.p.smith@faa.gov.

From Combined Synopsis/Solicitation posted on Feb 12, 2026

2/12/2026: the additional four (4) questions and answers (numbered 4-7) are being posted to clarify the requirement. 4) Can you confirm what specific drives you plan on using for the servers? Answer: 4th paragraph down in the spec .1 solid state memory drive. 5) I wanted to confirm if this will be purchased through SAVES or not? Answer: This will not be purchased through SAVES 6) Could you please confirm whether this request is brand-specific or if equivalent/ comparable specs are acceptable? If equivalents are allowed, please let us know if alternatives that meet or exceed the spec sheet requirements would be considered. Answer: This is not brand name specific. Equivalents that meet or exceed the spec are allowed but bear in mind this is essentially low price technically acceptable with technical acceptability defined by the specifications. 7) Additionally, could you confirm the quantities for each line item (e.g., hard drives, memory, CPUs)? Answer: See the response to question 3 posted on 2/10. _______________________________________________________________________________________________ 2/10/2026: The following three (3) questions and answers are being posted to clarify the requirement. 1) How much total memory are you needing per node? Answer: Total Memory is Per unit/computer The required RAM memory per the spec is 128GB DDR5-6400 ECC Registered 288-Pin SDRAM Quality Burn-in Certified by @Xi Req. 8+ DIMM MDB, 2+ CPU, max RAM speed CPU & load dependent and only for AMD & Xeon with DDR5 support as noted. Requires Rackmount with adequate ventilation.) 2) Can we use SAVES? Answer: Market Research was conducted via SAVES and the requirement was either not bid or the response was inadequate (missing specs) to determine compatibility with the requirement. This is being competed full and open. 3) Could you please confirm whether this request is brand-specific or if equivalent/ comparable specs are acceptable? If equivalents are allowed, please let us know if alternatives that meet or exceed the spec sheet requirements would be considered. Additionally, could you confirm the quantities for each line item (e.g., hard drives, memory, CPUs)? Answer: Neither the completed server, nor any of the components are brand specific; they are available and used by many computer manufactures to build complete computer systems in the commercial markets. Any component chosen must meet the minimum stated performance of the processor in GHz speeds; the bus speeds in MHz; and drive speeds in MB/s. This includes, but limited to, the motherboard, processor and cache, drives, RAM and all supporting components. A complete list of specifications and performance curves must be provided with your Quote for review and comparison by the FAA against the list of requirements. Manufacturer Support, Points of Contact must be provided with your Quote for confirmation of the provided specifications in the event component performance cannot be determined by the list of proposed specifications.The requirement is for (14) complete systems. The components provided in the Specs are commercially available to any supplier for these (14) complete systems. (1) of each component on the requirements list is required to complete (1) system for a total of (14) systems. _____________________________________________________________________________________________________ Original Post: The Federal Aviation Administration's (FAA) Target Generation Facility (TGF) requires 14 Computer Servers to replace outdated equipment. Attachments to this posting are as follows: 1 - Specifications (1 attachment) (quotes must be compliant with the specs listed.Quotes not adhering to the specifications will be disregarded. Refurbished equipment will not be accepted. 2 - AMS Clauses and Draft Purchase Order (3 Attachments) - Alternate "standard commercial terms and conditions" will not be accepted. Please do not mark quotes with commercial terms and conditions. Please direct all questions to Kevin Smith at 609-485-4574, or kevin.p.smith@faa.gov.

From Combined Synopsis/Solicitation posted on Feb 17, 2026

Notice history

4
  1. Combined Synopsis/Solicitation Posted Feb 06, 2026
  2. Combined Synopsis/Solicitation Posted Feb 10, 2026
    • Description: Description was updated
  3. Combined Synopsis/Solicitation Posted Feb 12, 2026
    • Description: Description was updated
  4. Combined Synopsis/Solicitation LATEST Posted Feb 17, 2026
    No changes from previous notice

Details

Solicitation number 692M15-26-P-00007
Notice ID 3184ad3ef6c24d9697bc63c15e3c4fee
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 7B22
NAICS 334112
Set-aside No Set aside used
Place of performance Egg Harbor Township, New Jersey
Archive date Mar 07, 2026

Award Information

Not yet awarded

Contacts

primary
Kevin Smith

Email

Phone

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL AVIATION ADMINISTRATION
FAA WILLIAM J HUGHES TECHNICAL CENT

Place of Performance

Egg Harbor Township, New Jersey 08234
USA

Dates

Posted Feb 06, 2026 6 months ago
Last Updated Aug 06, 2026 1 day ago
Due Feb 20, 2026 5 months ago