Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 2 notices

FA527025R0023_LXEZ 221020 Repair Restrooms, B839, Kadena AB, Okinawa, Japan FA527025R0023

Solicitation FA527025R0023 Copied Notice ID f8d99079e90a436e8f0f4df8517efa86 Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Jun 09, 2025
Deadline
Jul 07, 2025
Set-aside
None
NAICS
236220
PSC
Z2EB

Summary

AI-generated · Aug 25, 2025

Repair and renovation of restrooms and related utilities at B839, Kadena AB, Okinawa, Japan, requiring comprehensive design and construction to deliver a fully functional facility. Provide all labor, materials, and equipment to repair the restrooms to restore essential personal hygiene accommodations for the 18th Equipment Maintenance Squadron. Work reorganizes the female and male restrooms and locker rooms, removes obstructions to save space, adds space for a female locker room, and installs new fixtures and components. It includes replacing lavatories, toilets, urinals, interior walls/ceilings/floors, doors, and finishes; painting; upgrading HVAC, sanitary sewer, and cold/hot water systems; and replacing the sewer line to the main service with trenching/backfill. Suspected hazardous materials (asbestos-containing material and lead-based paint) require abatement, with AHAP/LHAP approvals obtained prior to work. The contractor must determine the best technical design solution in conformance with applicable US federal, DoD, Air Force, and 18 Wing criteria, and Japan requirements, to provide a complete, usable facility; design and construction must follow the attached SOW and sustainable, life-cycle cost–effective practices per UFC 1-200-02, including abatement planning and sampling if new ACM/LBP materials are found, with ASAR/LSAR documentation submitted to the Contracting Officer.

Amendments indicate changes and new information: the pre-proposal site visit time was changed to 3:00 PM, the SOW was attached/updated, a Request for Information #02 was issued, and proposal due dates were extended to late July. If new ACM/LBP materials are discovered, sampling plans must be submitted for approval, and AHAP/LHAP approvals must be secured before work begins. The requirements remain aligned with US DoD/AF and 18 Wing standards and Japan regulatory requirements to deliver a complete facility.

Amendment 0002: Change pre-proposal site visit schedule from 1000hrs (10AM), 12 Jun 25 to 1500hrs (3PM), 12Jun25.Amendment 0001: Attach and upload Statement of Work, LXEZ221020 Repair Restrooms B839 SOW_07_March_2025 (1).The project scope consists of, but is not limited to, providing all field investigations, surveys, design, plant, labor, supervision, materials, equipment, supplies,transportation, third-party services, and incidental related work to design and execute construction work defined in this Statement of Work and the attacheddocuments. The work includes all necessary finishing work to provide the Government with a final product that is fully functional and leaves no areas of the facilitythat appear incomplete or unfinished.A) Provide all labor, materials, and equipment necessary to repair the restrooms at B839 facility to provide support in restoring essential personal hygieneaccommodations for the (18 EMS) 18TH Equipment Maintenance Squadron. This project will reorganize existing female and male restrooms and locker roomslayout, remove abandoned obstructions to save space, add space for female locker room and provide new bathrooms fixtures and associated components.Replace lavatories, toilets, urinals, and associated fixtures. Remove/rework existing interior walls, ceiling, and flooring to add space for female locker room, andrepair corresponding electrical, plumbing, mechanical components/fixtures. Provide new interior doors with frames to support new floorplan. Paint interior walls,exterior walls, doors, door frames, and ceiling in the workspace areas. Replace HVAC, sanitary sewer plumbing, and cold/hot water plumbing systems and allassociated work. Replace sewer line up to the main service line with all associated trenching, backfill, and sodding. Suspect hazardous materials (hazmat) such asAsbestos Containing Material (ACM) and Lead-Based Paint (LBP) were tested in the bathroom walls. Project includes abatement on positive building materials thatwill be disturbed by the repairs of the project. Project design is 0% complete as of 01 May 2024. Sustainable principles, to include life cycle cost-effective practices,will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.B) The scope includes the abatement/removal of any ACM, LBP, or any hazardous materials. For detailed information, see the Section 8 and 9.If the Contractor determines that materials other than those already identified as ACM/LBP in the Government-provided records require additional sampling tosafety execute the awarded scope, notify the Contracting Officer, and submit sampling plans. After approval, conduct sampling and analysis in accordance with thespecifications and submit the Asbestos and/or Lead Sampling and Analysis Results (ASAR/LSAR) to the Contracting Officer for action.Ensure to submit and get approved AHAP/LHAP for the discovered ACM and LBP prior to beginning the work.C) The contractor shall determine the best technical design solution in conformance with current regulations. The design and construction work shall comply withUS federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in thisproject statement of work to provide a complete and usable facility upon completion.LXEZ 221020 Repair Restrooms, B839, Kadena AB, Okinawa, Japan, in accordance with (IAW) the Statement of Work (SOW)

From Solicitation posted on Jun 09, 2025

Amendment 0005: Attached Request for Information #02, dated 17 Jul 25.Amendment 0004: Extend proposal due date from 02:30PM, 15 July 2025 (JST) to 02:30PM, 22 July 2025 (JST)Amendment 0003: Extended proposal due date from 02:30PM, 7 July 2025 to 02:30PM, 15 July 2025 (JST). Attached Request for Information.Amendment 0002: Change pre-proposal site visit schedule from 1000hrs (10AM), 12 Jun 25 to 1500hrs (3PM), 12Jun25.Amendment 0001: Attach and upload Statement of Work, LXEZ221020 Repair Restrooms B839 SOW_07_March_2025 (1).The project scope consists of, but is not limited to, providing all field investigations, surveys, design, plant, labor, supervision, materials, equipment, supplies,transportation, third-party services, and incidental related work to design and execute construction work defined in this Statement of Work and the attacheddocuments. The work includes all necessary finishing work to provide the Government with a final product that is fully functional and leaves no areas of the facilitythat appear incomplete or unfinished.A) Provide all labor, materials, and equipment necessary to repair the restrooms at B839 facility to provide support in restoring essential personal hygieneaccommodations for the (18 EMS) 18TH Equipment Maintenance Squadron. This project will reorganize existing female and male restrooms and locker roomslayout, remove abandoned obstructions to save space, add space for female locker room and provide new bathrooms fixtures and associated components.Replace lavatories, toilets, urinals, and associated fixtures. Remove/rework existing interior walls, ceiling, and flooring to add space for female locker room, andrepair corresponding electrical, plumbing, mechanical components/fixtures. Provide new interior doors with frames to support new floorplan. Paint interior walls,exterior walls, doors, door frames, and ceiling in the workspace areas. Replace HVAC, sanitary sewer plumbing, and cold/hot water plumbing systems and allassociated work. Replace sewer line up to the main service line with all associated trenching, backfill, and sodding. Suspect hazardous materials (hazmat) such asAsbestos Containing Material (ACM) and Lead-Based Paint (LBP) were tested in the bathroom walls. Project includes abatement on positive building materials thatwill be disturbed by the repairs of the project. Project design is 0% complete as of 01 May 2024. Sustainable principles, to include life cycle cost-effective practices,will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.B) The scope includes the abatement/removal of any ACM, LBP, or any hazardous materials. For detailed information, see the Section 8 and 9.If the Contractor determines that materials other than those already identified as ACM/LBP in the Government-provided records require additional sampling tosafety execute the awarded scope, notify the Contracting Officer, and submit sampling plans. After approval, conduct sampling and analysis in accordance with thespecifications and submit the Asbestos and/or Lead Sampling and Analysis Results (ASAR/LSAR) to the Contracting Officer for action.Ensure to submit and get approved AHAP/LHAP for the discovered ACM and LBP prior to beginning the work.C) The contractor shall determine the best technical design solution in conformance with current regulations. The design and construction work shall comply withUS federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in thisproject statement of work to provide a complete and usable facility upon completion.LXEZ 221020 Repair Restrooms, B839, Kadena AB, Okinawa, Japan, in accordance with (IAW) the Statement of Work (SOW)

From Solicitation posted on Jul 17, 2025

Notice history

2
  1. Solicitation Posted Jun 09, 2025
  2. Solicitation LATEST Posted Jul 17, 2025
    • Description: Description was updated
    • Response Deadline: Jul 07, 2025Jul 22, 2025

Details

Solicitation number FA527025R0023
Notice ID f8d99079e90a436e8f0f4df8517efa86
Notice type Solicitation
Product / Service (PSC) Z2EB
NAICS 236220
Archive date Jun 09, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
KIYOSHI HIGA

Email

Phone

secondary
Gary Wynder

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

Dates

Posted Jun 09, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 07, 2025 1 year ago