F115--Sources Sought Notice Spill Prevention Control and Countermeasures Plan (SPCCP) 5-year review Marion, IL VA Medical Center 36C25526Q0066
Summary
AI-generated · Nov 04, 2025A 5-year review and amendment of the Spill Prevention, Control, and Countermeasures Plan (SPCCP) for the Marion, IL VA Medical Center is requested. The updated SPCCP must be fully compliant with the latest 40 CFR 112 requirements, as well as applicable state and local regulations, incorporating any design, construction, operation, or maintenance changes. It should include an updated emergency response plan for accidental releases of vehicular and equipment petroleum products, coolants, and lubricants, and cross-reference the Medical Center’s current Emergency Operations Plan and Integrated Contingency Plan.
The deliverable must be prepared by an Illinois-registered Professional Engineer experienced in SPCCP, and provided in an electronic, user-friendly format. Updates should cover plan content, maps, worksheets, charts, and cross-references, with the contractor allowed to reference current plans for technical information. The update must reflect any new reporting and training requirements and align with NFPA 30 and all applicable federal, state, and local regulations.
Revise Spill Prevention, Control, and Countermeasures Plan (SPCCP) For Marion, IL VA Medical Center (MRN) INTRODUCTION MRN VAMC is seeking a 5-year review and amendment of the current plan to verify compliance with current and any new requirements listed in (a-d) below and to update since the approval of the current SPCCP dated/signed March 30, 2021. The revised document shall be electronic and user-friendly. The contractor shall perform a 5-year review according to 40 CFR 112, to include any revisions, updates, or technical changes for amendment. The contractor will make necessary changes including plan content, maps, worksheets, charts, cross references, etc. The contractor may use current plans as references for technical information. SPECIFIC PROJECT REQUIREMENTS The contractor shall: amend, update, and prepare the existing SPCCP, which must be fully compliant with the latest requirements of 40 CFR 112 as well as applicable State and Local regulations. An update of the emergency response plan should be included for accidental releases of vehicular and equipment petroleum products, coolants, and lubricants within the SPCCP. This will include coordination with and cross-referencing the medical center s current Emergency Operations Plan and Integrated Contingency Plan. The plan shall be certified by an Illinois registered Professional Engineer (P.E.) experienced in SPCCP preparation and current industry standards for oil storage and spill prevention. 40CFR 112.7, Oil Pollution Prevention. Amend technical changes from design, construction, operation, and/or maintenance. National Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code. All applicable federal, state and local regulations. Provide updates for any new Reporting and Training requirements
From Sources Sought posted on Nov 03, 2025Notice history
1Details
Award Information
Contacts
Contracting Officer
Phone
Agency
Place of Performance
2401 West Main St.
Marion, Illinois 62959
USA