Contacts, documents and full notice history are available with a subscription.
Award Notice SDVOSBC 4 notices 1 document

F103--HVAC Cooling Towers Testing and Maintenance 36C26126Q0576

Solicitation 36C26126Q0576 Copied Notice ID 5b17e3e5f7fe435fb1410b4ac29c83e4 Copied VETERANS AFFAIRS, DEPARTMENT OF — 261-NETWORK CONTRACT OFFICE 21 (36C261)
SAM.gov
Posted
Apr 23, 2026
Deadline
May 19, 2026
Set-aside
SDVOSBC
NAICS
541380
PSC
F103

Summary

AI-generated · Apr 24, 2026

HVAC cooling tower testing and maintenance for the VA Palo Alto Health Care System, including periodic testing of cooling towers and ongoing preventive maintenance to ensure reliable operation and compliance with applicable standards. The full RFQ will include all specifications and information needed to quote the project; bidders should monitor SAM.gov for the posting and follow the solicitation’s instructions for questions and quote submission.

Between notices, the presolicitation indicates an upcoming RFQ with posting details and a deadline for questions to be defined in the solicitation, and the End of Amendment confirms the solicitation has been amended. The Awards section lists two awards, each showing an amount of $0.00.

DEPARTMENT OF VETERANS AFFAIRS NETWORK CONTRACTING OFFICE 21 (NCO 21) Description: THIS IS A PRE-SOLICITATION NOTICE FOR A REQUEST FOR QUOTE (RFQ). VA Palo Alto Health Care System has an immediate need for HVAC Cooling Tower Testing and Maintenance. Solicitation Number 36C26126Q0576 for this effort will be posted to SAM.GOV (https://sam.gov) on or about April 23, 2026. This solicitation will contain all necessary specifications and information necessary to quote the project. See solicitation for when questions must be submitted. Quotes are tentatively scheduled to be due on Tuesday, May 19, 2026 (see solicitation when available for specific time/date). Point of Contact: Tim Smith, Contract Specialist, Timothy.smith9de3@va.gov. Questions regarding this notice may be submitted via e-mail to Timothy.smith9de3@va.gov.

From Presolicitation posted on Apr 23, 2026

End of Amendment

From Solicitation posted on Apr 23, 2026

Question and Answer What is the system volume of each CT? The specifications vary depending on the cooling tower. Please refer to the make and model information outlined in the Performance Work Statement, Scope of Work, or inventory for these details. What are the cubic feet of each CT (including underground sumps)? Please refer to the make and model information provided in the inventory. For PAD (VA Palo Alto), Building 100, the cooling tower sump dimensions are 25 feet by 44 feet, with an approximate depth of 6 feet. What is the annual average continuous cooling tonnage for each CT? It varies depending on the location. Please refer to the Performance Work Statement or Scope of Work for further details. Who owns the existing chemical tanks, chemical pumps, and water treatment controllers? The VA owns the existing water treatment controllers, chemical base tanks, and chemical pumps. Should the cost of new water treatment controllers, chemical base tanks, and chemical pumps be included in the bid? The VA owns the existing water treatment controllers, chemical base tanks, and chemical pumps; therefore, the cost of these systems should be excluded. What is the current chemical delivery process? What package size is used for chemical base tanks, and who is responsible for transfer into the base tanks? The contractor shall be responsible for determining the appropriate size of the chemical base tank at each location, as well as for the delivery of chemicals and their transfer into the base tanks. What are the closed-loop volumes, and should the cost of biocide treatment be included? The VA is unable to provide this information currently. The contractor may need to utilize estimation tools to approximate the volume of these closed loops. Additionally, chemicals may be added incrementally until the required parts per million (ppm) of corrosion inhibitor are achieved. What is the approximate annual closed-loop makeup water volume for determining inhibitor treatment demand? We do not have a specific number for this, as it fluctuates frequently due to leaks and ongoing maintenance activities. The demand for inhibitor treatment will vary in accordance with the condition of the loop at any given time. Water samples could not be obtained during the site survey. Please provide the cooling water makeup quality or target cycles for cooling water makeup quality or target cycles at this time. All cooling towers and closed loops are currently maintained in accordance with VA HVAC standards and are operating within established limits. At this time, we are unable to provide detailed information; however, a sample report may be made available to the awardee following contract award, in accordance with the Performance Work Statement or Scope of Work. Will the onsite team pull samples for Nalco field water testing? No, the contractor (awardee) representative will be responsible for collecting, analyzing, and reporting sample data as required by the contract. VA representatives will not collect samples on behalf of the contractor. Can we propose monthly CT service with a smart controller and continuous remote monitoring as a substitute for weekly non-connected controllers? No. The contractor s representative is required to perform testing in person to ensure that all aspects of the system are thoroughly evaluated, and so that the technician can observe and report any changes to the COR for awareness. Please refer to the Performance Work Statement or Scope of Work for this contract for additional details. Can we use third-party chemical drum drop-off delivery? It is preferred and recommended that the contractor (awardee) receive and store chemical deliveries at their local site, as the VA will not be responsible for any missing or stolen deliveries. Could you provide the model and SN? Please refer to the Performance Work Statement or Scope of Work for a detailed inventory, which includes make and model information. Could you provide information on the sort of testing and maintenance you are looking for? Please refer to the Performance Work Statement or Scope of Work for this contract for detailed information regarding the maintenance checklist for cooling towers (CT) on a monthly, quarterly, and annual basis, as well as the types of tests required for cooling towers and closed loops. Do they want a rep onsite for weekly testing? Yes, it is required as per contract. Will a total of 20 samples be collected from the entire campus or 20 samples from each individual building? Please refer to the Performance Work Statement or Scope of Work for information regarding the number of loops and cooling towers, as well as the total number of samples to be collected. Samples are to be obtained from various buildings, campuses, or locations.

From Solicitation posted on May 20, 2026

Notice history

4
  1. Presolicitation Posted Apr 23, 2026
  2. Solicitation Posted Apr 23, 2026
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Set-Aside: Service-Disabled Veteran-Owned Small Business Set AsideNone
  3. Solicitation Posted May 20, 2026
    • Description: Description was updated
    • Response Deadline: May 19, 2026May 27, 2026
  4. Award Notice LATEST Posted Jun 29, 2026

Details

Solicitation number 36C26126Q0576
Notice ID 5b17e3e5f7fe435fb1410b4ac29c83e4
Award number 36C26126P0786
Notice type Presolicitation
Product / Service (PSC) F103
NAICS 541380
Archive date Jul 18, 2026

Award Information

Awardee
1
Total Awarded
$1,259,680.32
Award Date
Jun 29, 2026

Awardees

Company Name UEI CAGE Code Location
EWA DIRECTION INC. ZHAMN7JMA791 6TM80 HONOLULU

Documents

1
View on SAM.gov

Contacts

primary
Tim Smith

Contract Specialist

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
261-NETWORK CONTRACT OFFICE 21 (36C261)

Place of Performance

See Performance Work Statement

Dates

Posted Apr 23, 2026 3 months ago
Last Updated Aug 06, 2026 3 days ago
Due May 19, 2026 2 months ago