F--Roy Pray Portal Repairs 140L1725R0017
Summary
AI-generated · Sep 29, 2025Excavate the Roy Pray portal area and install a properly designed portal structure and replacement gate, with steel sets extending from approximately Station 0+84 to Station 1+12.5. Lag the sets with steel channel or similar, fill overhead cavities with polyurea silicate void filling foam to prevent impact loading, thoroughly scale the adit, and remove rockfall or debris on the invert to eliminate tripping hazards. Clean up existing tripping hazards and install rockbolting and meshing as a risk-reduction measure to protect personnel during safety inspections. A BLM-approved archaeological monitor is required to oversee the work, and a work plan must be developed that preserves the site's eligibility and integrity for NRHP listing.
A formal award has been issued for Roy Pray Portal Repairs to North Wind General Contractors LLC for $656,311.03. The initial notice referenced North Wind Construction Services, LLC as the intended awardee, indicating a discrepancy in the awardee name between notices; otherwise, the scope and NRHP considerations remain the same.
Roy Pray Portal Repairs SPECIAL NOTICE: THIS IS NOT A NOTICE OF SOLICITATION ISSUANCE. The Bureau of Land Management intends to issue an award to an 8(a) company named North Wind Construction Services, LLC, 1425 Higham St., Idaho Falls, ID 83402 The Roy Pray Mine Site has been determined to be eligible for listing on the National Register of Historic Places (NRHP). A work plan will need to be developed that does not affect the site's eligibility and integrity. A BLM approved archaeological monitor will be required to monitor the activities. Excavate the portal area and then install a properly designed and constructed portal structure and replacement gate, with steel sets extending from approximately Station 0+84 to Station 1+12.5. It is recommended that these sets be lagged with steel channel or other steel material and that cavities overhead be filled with polyurea silicate void filling foam to prevent impact loading. As a matter of routine safety, the entire adit should be thoroughly scaled and afterwards, any rockfall or debris on the invert should be removed to eliminate unnecessary tripping hazards. Existing tripping hazards should be cleaned up as well. Rockbolting and meshing should be installed as an appropriate risk reduction measure to protect personnel during safety inspections. NAICS code is 562910 Remediation Services with size standard of $25 Mil. This Special Notice is issued solely for information and planning purposes. For questions, please contact Contract Specialist: Kerry Spetter via email at kspetter@blm.gov.
From Special Notice posted on Sep 22, 2025Roy Pray Portal Repairs The Roy Pray Mine Site has been determined to be eligible for listing on the National Register of Historic Places (NRHP). A work plan will need to be developed that does not affect the site's eligibility and integrity. A BLM approved archaeological monitor will be required to monitor the activities. Excavate the portal area and then install a properly designed and constructed portal structure and replacement gate, with steel sets extending from approximately Station 0+84 to Station 1+12.5. It is recommended that these sets be lagged with steel channel or other steel material and that cavities overhead be filled with polyurea silicate void filling foam to prevent impact loading. As a matter of routine safety, the entire adit should be thoroughly scaled and afterwards, any rockfall or debris on the invert should be removed to eliminate unnecessary tripping hazards. Existing tripping hazards should be cleaned up as well. Rockbolting and meshing should be installed as an appropriate risk reduction measure to protect personnel during safety inspections.
From Award Notice posted on Sep 23, 2025Notice history
2-
Special Notice Posted Sep 22, 2025
-
Award Notice LATEST Posted Sep 23, 2025
Details
Award Information
Award Notices
Posted: Sep 23, 2025
Roy Pray Portal Repairs The Roy Pray Mine Site has been determined to be eligible for listing on the National Register of Historic Places (NRHP). A work plan will need to be developed that does not affect the site's eligibility and integrity. A BLM approved archaeological monitor will be required to...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| NORTH WIND GENERAL CONTRACTORS LLC | MJG1DJYMASR5 | 8FZ01 | Idaho Falls, ID |
Contacts
Phone
(303) 239-3699