Aircraft Bed-down Program, Construction Services at Nellis Air Force Base, Nevada W912PL26S0004
Summary
AI-generated · Jan 30, 2026Prime contractors are being sought to compete for a Prequalified Sources List (PQSL) for the F-47 Bed-down Program, a construction services effort at Nellis Air Force Base, Nevada. This market research, conducted under DFARS 236.272, aims to identify firms interested in qualifying to bid on future phases of the program.
The project is planned to proceed in three phases, with PQSL eligibility determining which firms may participate in subsequent solicitations for the bed-down construction work.
The U.S. Army Corps of Engineers (USACE), Los Angeles District, is conducting market research to identify prime contractors interested in competing for a Prequalified Sources List (PQSL) in accordance with DFARS 236.272 for the F-47 Bed-down Program, at Nellis Air Force Base, Nevada. This program is expected to be executed in three phases.
From Sources Sought posted on Jan 29, 2026The U.S. Army Corps of Engineers (USACE), Los Angeles District, is conducting market research to identify prime contractors interested in competing for a Prequalified Sources List (PQSL) in accordance with DFARS 236.272 for the F-47 Bed-down Program, at Nellis Air Force Base, Nevada. This program is expected to be executed in three phases.
From Sources Sought posted on Jan 30, 2026The U.S. Army Corps of Engineers (USACE), Los Angeles District, is conducting market research to identify prime contractors interested in competing for a Prequalified Sources List (PQSL) in accordance with DFARS 236.272 for the F-47 Bed-down Program, at Nellis Air Force Base, Nevada. This program is expected to be executed in three phases.
From Sources Sought posted on Feb 02, 2026The U.S. Army Corps of Engineers (USACE), Los Angeles District, is conducting market research to identify prime contractors interested in competing for a Prequalified Sources List (PQSL) in accordance with DFARS 236.272 for the Aircraft Bed-down Program, at Nellis Air Force Base, Nevada. This program is expected to be executed in three phases.
From Sources Sought posted on Feb 25, 2026Notice history
4-
-
Sources Sought Posted Jan 30, 2026No changes from previous notice
-
Sources Sought Posted Feb 02, 2026No changes from previous notice
-
Sources Sought LATEST Posted Feb 25, 2026View changes (2)
- Title: F-47 Bed-down Program, Construction Services at Nellis Air Force Base, Nevada → Aircraft Bed-down Program, Construction Services at Nellis Air Force Base, Nevada
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA