Expandable Small Air Mobility Shelters FA466125Q0191
Summary
AI-generated · Aug 28, 2025Three green Expandable Small Air Mobility Shelters (ESAMS) are required for training and deployment activities. They must be ATTLA-rated for Land, Sea, Internal Airlift (fixed-wing), and Slingable Airlift (helicopter), and must fit inside an Internal Slingable Unit (ISU) 90. Each shelter should include a center hard personnel door and a soft door in every expandable section, a 42,000 BTU/hr energy control unit with a slide-in/out design to maintain a single-pallet footprint for air transport, and electrical input/output capable of 120/208 VAC, 3-phase at 100 A and 60 Hz with 100 ft shore and slave cables, respectively. Additional features include shelter leveling jacks; LED lighting with dimming, blackout, and emergency backup; a safety kit; supply/return 16" ECU ports; a communications panel with customer-specified connectors and two duplex 110 V outlets; 4x RJ-45 CATG; 2x N-Type RF bulkheads; 2x 110 V AC 12 x 12 plates; an automatic transfer switch; a 19" equipment rack with shock isolators, locking front/rear doors, a slide-out tray, and cable management/ground bar; power strips for the rack; and a one-year standard commercial warranty.
Submission requires email of the quote with a signed RFQ Page 2 (or contractor equivalent), a fully completed CLIN schedule, specification of proposed items, and warranty information. Questions must be submitted by the stated cutoff, an amendment will be issued addressing all questions, and quotes must be received by the stated deadline and emailed to the designated contracting officers.
The 21st Air Transportable Force (ATF) requires three (3) (Green) Expandable Small Air Mobility Shelters (ESAMS) to support training and deployment activities. These shelters must be rated by the Air Transportability Test Loading Activity (ATTLA) for Land, Sea, Internal Airlift (fixed-wing aircraft), and Slingable Airlift (helicopter). Additionally, the 3 Shelters must all meet the following specifications: 0001:Fits inside an Internal Slingable Unit (ISU) 90. 0002:(1) Hard personnel door in center section, (1) soft door in each expandable section 0003: 42K BTU/Hr ECU (Slide In/Out quoted to keep single pallet position for air transport) 0004: 120/208 VAC, 3-Phase, 100 Amp, 60 Hz Electrical Input (100 Ft Shore cable quoted) 0005: 20/208 VAC, 3-Phase, 60 Amp, 60 Hz Electrical Output (100 Ft Slave cable quoted) 0006: Shelter Leveling Jacks 0007: LED Lights w/ Dimming/Blackout/Emergency Backup 0008: Safety Kit included 0009: Supply/Return 16" ECU Ports 0010: Communications Panel w/ customer specified connectors and (2) duplex 110 VAC outlets 0010.1: 4x RJ-45 CATG 2x N-Type RF Bulkheads 2x 110V AC 12 x12 plate 0011:Automatic Transfer Switch 0012: 19" Equipment Rack w/ Shock Isolators, Locking Front/Rear Door, Slide-Out Tray, Cable Management/Ground Bar 0013: Power Strips for Rack 0014: 1 Year standard commercial warranty included. QUOTE SUBMISSION INFORMATION: E-mail is the required method for offer submission. Your offer shall include but is not limited to the following: Complete (must be signed) Page 2 of RFQ * or contractor equivalent Fully Completed CLIN Schedule Specification of proposed items. Warranty (All information regarding applicable standard commercial warranties must be included). Please submit questions to the email addresses, reijo.rantala@us.af.mil and trevor.finch.1@us.af.mil, NLT 1 September 2025, 12:00 p.m. (CST). An amendment will be issued with answering all questions received. Deadline for receipt of offers: 4 September 2025, 3:00 p.m. (CST). All quotes shall be emailed to reijo.rantala@us.af.mil and trevor.finch.1@us.af.mil.
From Combined Synopsis/Solicitation posted on Aug 27, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA