EMCS (Energy Management Control System) COINv2 Server FA282325Q0044
Summary
AI-generated · Aug 24, 2025EMCS COINv2 Server for Eglin AFB requires delivery of an Energy Management Control System server that integrates with the Eglin DDC System and Network, must be housed in a lockable enclosure, and meet cybersecurity requirements. The procurement is brand-name only (J&A), with supporting documents including the RFQ details and a Statement of Work, and it references the applicable wage determination.
Amendments have added a Questions and Answers response, extended the solicitation, updated the Wage Determination to Revision 31, and, in a later notice, added a site visit. The site visit is scheduled at Building 696 on 11 August 2025 at 1:00 PM CST.
Combined Synopsis/Solicitation EMCS (Energy Management Control System) COINv2 Server Eglin AFB, FL Offers are due by 10:00CST, August 7, 2025, via electronic mail to Victoria Thomas at victoria.thomas.6@us.af.mil, (The quote shall be effective for 60 days after submission of quote) Questions are due 10:00CST, 30 July 2025, via electronic mail to Victoria Thomas at victoria.thomas.6@us.af.mil. See attachments: Combined Synopsis/Soliication for RFQ details Brand Name J&A Statement of Work Eglin DDC System and Network with Lockable enclosure and Cybersecuirty requirements dated 18 April 2024 Wage Determination 2015-4531 Revision Number 30
From Combined Synopsis/Solicitation posted on Jul 23, 2025Combined Synopsis/Solicitation EMCS (Energy Management Control System) COINv2 Server Eglin AFB, FL Offers are due by 10:00CST, August 7, 2025, via electronic mail to Victoria Thomas at victoria.thomas.6@us.af.mil, (The quote shall be effective for 60 days after submission of quote) Questions are due 10:00CST, 30 July 2025, via electronic mail to Victoria Thomas at victoria.thomas.6@us.af.mil. See attachments: Combined Synopsis/Soliication for RFQ details Brand Name J&A Statement of Work Eglin DDC System and Network with Lockable enclosure and Cybersecuirty requirements dated 18 April 2024 Wage Determination 2015-4531 Revision Number 31 Admentment 1 7-31-2025 Added Questons and Answers
From Combined Synopsis/Solicitation posted on Jul 31, 2025Combined Synopsis/Solicitation EMCS (Energy Management Control System) COINv2 Server Eglin AFB, FL Offers are due by 10:00CST, August 14, 2025, via electronic mail to Victoria Thomas at victoria.thomas.6@us.af.mil, (The quote shall be effective for 60 days after submission of quote) Questions are due 10:00CST, 11 July 2025, via electronic mail to Victoria Thomas at victoria.thomas.6@us.af.mil. See attachments: Combined Synopsis/Soliication for RFQ details Brand Name J&A Statement of Work Eglin DDC System and Network with Lockable enclosure and Cybersecuirty requirements dated 18 April 2024 Wage Determination 2015-4531 Revision Number 31 Amendment 1: 7-31-2025 Added Questons and Answers Amendment 2: 8-7-2025 The purpose of this amendment is to extend the soliciation due date to the 14 August 2025 at 10:00 CST. also add the updated Wage Determination 2015-4531 Revision Number 31 Amendment 3: 8-8-2025 The purpose of this amendment is to add a site visit for 11 August 2025 at 1:00PM CST at Bldg. 696. Email Victoria Thomas at victoria.thomas.6@us.af.mil if you would like to attend.
From Combined Synopsis/Solicitation posted on Aug 08, 2025Notice history
3-
Combined Synopsis/Solicitation Posted Jul 23, 2025
-
Combined Synopsis/Solicitation Posted Jul 31, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation LATEST Posted Aug 08, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 07, 2025 → Aug 14, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA