EM-DTOS Bldg Roof Replacement Project W912P526QA005
Summary
AI-generated · Nov 18, 2025A firm-fixed-price roof replacement project is being researched to determine competitive interest for the EM-DTOS Building in Old Hickory, TN. The work includes removing 350 square feet of damaged roofing on the southern corner, replacing 350 square feet of damaged paneling and insulation, inspecting the entire 5,000 square foot building for unknown damages, and replacing the gutter and downspout system across the building. It also requires replacing two roof ventilation fans and reconnecting them with the wall ventilation system, increasing insulation to R-15, and installing a new metal roof whose material will be selected based on the building design and the COR’s preferences. The roofing materials must be standard, commercially available, and compliant with applicable warranties; prototypes or demos will not be accepted. De-energizing electrical utilities must be approved by the COR at least 14 days in advance.
Daily cleanup is mandatory, including hands-on cleanup and magnet sweeps at the end of each day, plus use of a blower to clear the roof surface and surrounding areas. A final inspection will be conducted to verify safety and quality, with the contractor required to notify the COR at least 3 business days prior to the final inspection. This notice is a market research/response-solicitation activity to assess competition and is not a solicitation; responses should indicate capability and relevant experience, and whether the firm plans to submit a bid if a procurement is announced.
REQUEST FOR INFORMATION The Government is issuing this Request for Information to determine a competitive basis for this procurement described. This is NOT a solicitation. No reimbursement will be made for any costs associated with providing information in response to this survey. This survey is for market research purposes only. Only contractor capable of providing this type of construction should respond to this Request for Information. Requirement The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates a requirement for a firm fixed-price construction contract for Roof Replacement Project for EM-DTOS Building in Old Hickory, TN. The anticipated NAICS code is 238160 Roofing Contractor, Size Standard $19.0 M. The estimated magnitude of this project is between $25,000 and $100,000. Description of Work: The metal roof and all materials shall be capable of performing within the parameters for which it was designed and intended function, in accordance with the operating and performance requirements specified herein in accordance with the manufacturer s warranty requirements. The new metal roof and materials shall be of standard, commercial, design; prototypes and demos will not be accepted. The installment of the new metal roof and materials shall be completed so that when the roofing is installed and assembled for any purpose and/or function for which it is designed and/or constructed by the manufacturer. The Contractor shall remove existing 350 square feet of damaged roofing on the southern corner of the DTOS building. Replacement of the 350 square feet of damaged paneling and insulation removed from the southern corner of the DTOS building. Conduct an inspection of the entire 5,000 square foot building for any unknown damages that need to be addressed. Replace the gutter and downspout system for the entire building. Replacement of the two ventilation fans on the roof of the building and reestablish connection with the wall fan ventilation fans of the building. Increase insulation value to R-15. Installation of new roofing materials: The specific type of metal roofing material will depend on the DTOS building s design and the customer s and COR s preferences. De-energize of any electrical utilities must be requested for approval to the COR no later than 14 days in advance. Clean-up and disposal: All debris and waste materials from the roof replacement will be properly cleaned up and disposed of daily. Contractors will perform a thorough hands-on daily cleanup and magnet sweep at the end of each day to pick up and dispose of all debris such as nails, screws, etc. In addition, the contractor shall also use a blower to blow the roof surface, decks, and areas around the DTOS building clean of such debris and the end of each day prior to departing from the site. Final inspection: A final inspection will be conducted to ensure that the new roof meets all safety and quality standards. Contractor shall inform COR within 3 business days prior to final inspection to provide enough time for all required key personnel to attend. Survey The Government is issuing this notice to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change or eliminated from the requirement. This survey is for market research purposes only. Only contractor capable of providing this type of work should respond to this Request for Information. Your response to this survey is request by 2:00 PM Central Time, November 21, 2025. Please sent by email to Kenyanna Jennings at Kenyanna.L.Jennings@usace.army.mil and Alison Abernathy at Alison.T.Abernathy@usace.army.mil. Name of your firm: CAGE: Point of Contact, Phone Number and Email Address: Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g.HubZone, 8(a), SDVOSB, WOSB, etc.)? For this requirement, what percentage of this work would you subcontract (reference FAR 52.219-14, Limitations of Subcontracting, Class Deviation 2019-O0003)? Do you plan to subcontract to only small businesses? If the answer to question 3 is yes , are these small businesses with a sub-category (e.g.HubZone, 8(a), SDVOSB, WOSB, etc.)? If this requirement is advertised, do you anticipate submitting a quote? Lis one (1) contract completed or substantially completed (75%) within the last 10 years valued between $25,000 and $100,000 that demonstrates the contractor s experience, as a prime contractor or subcontractor, of similar scope as this requirement (Roofing): Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General Description of Project: 10. Please provide any additional information you feel is necessary:
From Sources Sought posted on Nov 17, 2025PROJECT: EM-DTOS BLDG ROOF REPLACEMENT PROJECT, OLD HICKORY, TN. REFERENCE: SOURCES SOUGHT W912P526QA005. See attached documents for specific details.
From Solicitation posted on Dec 01, 2025****UPDATE***** AMENDMENT 0001 PROJECT: EM DTOS ROOF PROJECT, OLD HICKORY, TN PURPOSE: The purpose of this amendment is to: 1) Extend the deadline for questions to 5 December 2025 at 5:00PM Central Time. 2) Extend the quote due date to 12 December 2025 at 2:00PM Central Time. 3) Provide Site Visit Information. 4) Update FAR 52.252-3, Alterations in Solicitation. Site visit is scheduled for December 3, 2025 at 10:00AM - 11:30AM Central 1188 Cinder Road Old Hickory, TN 37138 PROJECT: EM-DTOS BLDG ROOF REPLACEMENT PROJECT, OLD HICKORY, TN. REFERENCE: SOURCES SOUGHT W912P526QA005. See attached documents for specific details.
From Solicitation posted on Dec 02, 2025****UPDATE***** AMENDMENT 0002 PROJECT: EM DTOS ROOF PROJECT, OLD HICKORY, TN PURPOSE: The purpose of this amendment is to: 1) Provide revised Performance Work Statement (PWS) 2) Provide Government answers to questions received from Industry. 3) Provide the physical site visit sign-in sheet. 4) Update FAR 52.252-3, Alterations in Solicitation. ****UPDATE***** AMENDMENT 0001 PROJECT: EM DTOS ROOF PROJECT, OLD HICKORY, TN PURPOSE: The purpose of this amendment is to: 1) Extend the deadline for questions to 5 December 2025 at 5:00PM Central Time. 2) Extend the quote due date to 12 December 2025 at 2:00PM Central Time. 3) Provide Site Visit Information. 4) Update FAR 52.252-3, Alterations in Solicitation. Site visit is scheduled for December 3, 2025 at 10:00AM - 11:30AM Central 1188 Cinder Road Old Hickory, TN 37138 PROJECT: EM-DTOS BLDG ROOF REPLACEMENT PROJECT, OLD HICKORY, TN. REFERENCE: SOURCES SOUGHT W912P526QA005. See attached documents for specific details.
From Solicitation posted on Dec 08, 2025Notice history
4-
Sources Sought Posted Nov 17, 2025
-
Solicitation Posted Dec 01, 2025View changes (3)
- Description: Description was updated
- Notice Type: Sources Sought → Solicitation
- Response Deadline: Nov 21, 2025 → Dec 08, 2025
-
Solicitation Posted Dec 02, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Dec 08, 2025 → Dec 18, 2025
-
Solicitation LATEST Posted Dec 08, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Dec 18, 2025 → Dec 12, 2025
Details
Award Information
Not yet awarded