Elevator Modernization Project ISO219-26
Summary
AI-generated · Apr 07, 2026Modernize three passenger elevators and one freight elevator at the Central Office in Washington, DC. The motor room must have its own separate entrance; to meet building codes, the contractor will close the current entrance from the engineer’s room and install an exterior door with stairs. Amendments have updated the project site location and the mandatory site-visit information.
4.6.26 Amendment 02 - Updated project site location 4.6.26 Amendment 01 - Updated Mandatory Site Visit Information Central Office in Washington, DC has identified a need to procure for modernization of three (3) passenger elevators and one (1) freight elevator. Also as a requirement, the elevator motor room must have its own separate entrance. Therefore the contractor will close off the current entrance from the engineer's room and bulid an outsidedoor with stairs to comply with building codes.
From Combined Synopsis/Solicitation posted on Apr 06, 20264.8.26 Amendment 03 - Adding Technical Specifications 4.6.26 Amendment 02 - Updated project site location 4.6.26 Amendment 01 - Updated Mandatory Site Visit Information Central Office in Washington, DC has identified a need to procure for modernization of three (3) passenger elevators and one (1) freight elevator. Also as a requirement, the elevator motor room must have its own separate entrance. Therefore the contractor will close off the current entrance from the engineer's room and bulid an outsidedoor with stairs to comply with building codes.
From Combined Synopsis/Solicitation posted on Apr 08, 2026Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Apr 08, 2026View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Documents
9Contacts
Agency
Place of Performance
USA