Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 4 notices 1 document

ELECTRONIC COMPONENT ASSEMBLY SPRDL1-25-Q-0156

Solicitation SPRDL1-25-Q-0156 Copied Notice ID aded3049daf64b918cd01618e5322d03 Copied DEPT OF DEFENSE — DLA LAND WARREN
SAM.gov
Posted
Dec 09, 2025
Deadline
Dec 09, 2025
Set-aside
SBA
NAICS
334418
PSC
5998

Summary

AI-generated · Aug 24, 2025

Electronic Component Assembly for NSN 5998-99-701-2178 (CS2002 / K0824) is being pursued to support the Breacher Assault Vehicle. The initial notice was a sources-sought to identify capable suppliers and is informational only, not a solicitation.

A presolicitation confirms a forthcoming firm-fixed-price solicitation with a basic quantity of 22 units and an option for up to 44 more, to be delivered FOB Destination with MIL-B packaging. The item is CS2002 / K0824, intended for the Breacher Assault Vehicle, and the effort falls under Printed Circuit Assembly Manufacturing. This reflects a shift from information-gathering to a defined contracting opportunity with specific quantities, packaging, and price type.

MORE INFORMATION CAN BE FOUND IN THE ATTACHED WORD DOCUMENT Sources Sought Notice 1.0 Introduction DLA Land - Warren is conducting a Sources Sought/Request for Information to identify potential sources capable of supplying the Electronic Component Assembly This is NOT a formal solicitation notice. This Sources Sought is for informational purposes only and is not a request for proposals. 2.0 Item Description Item Name: Electronic Component Assembly National Stock Number (NSN): 5998-99-701-2178 US Government Part Number: CS2002 End Item: Breacher Assault Vehicle Technical Data and Top Drawing are Sourced Controlled to: Pearson Engineering Limited CAGE: K0824 Part Number: CS2002

From Sources Sought posted on Aug 05, 2025

THIS IS A PRE-SOLICITATION NOTICE - All other information can be found in the attachment TITLE (NOUN): ELECTRONIC COMPONENT ASSEMBLY NOTICE ID (SOLICITATION NO.): SPRDL1-25-Q-0156 PSC: 5998 NAICS: 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing DLA Land Warren plans to post the following requirement - Item: Electronic Component Assembly NSN: 5998-99-701-2178 Part Number: CS2002 / K0824 Basic Quantity: 22 Each. Option Quantity: Up to 44 Each. FOB Point: Destination. Packaging: MIL B. Type Award: Firm-Fixed-Price.

From Presolicitation posted on Aug 14, 2025

THIS IS A PRE-SOLICITATION NOTICE - All other information can be found in the attachment TITLE (NOUN): ELECTRONIC COMPONENT ASSEMBLY NOTICE ID (SOLICITATION NO.): SPRDL1-25-Q-0156 PSC: 5998 NAICS: 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing DLA Land Warren plans to post the following requirement - Item: Electronic Component Assembly NSN: 5998-99-701-2178 Part Number: CS2002 / K0824 Basic Quantity: 22 Each. Option Quantity: Up to 44 Each. FOB Point: Destination. Packaging: MIL B. Type Award: Firm-Fixed-Price.

From Presolicitation posted on Aug 15, 2025

Solicitation posted with a closing date of 2025 NOV 21 at 4pm

From Solicitation posted on Dec 09, 2025

Notice history

4
  1. Sources Sought Posted Aug 05, 2025 View
  2. Presolicitation Posted Aug 14, 2025
    • Description: Description was updated
    • Notice Type: Sources SoughtPresolicitation
    • Response Deadline: Aug 14, 2025Sep 02, 2025
  3. Presolicitation Posted Aug 15, 2025
    No changes from previous notice
  4. Solicitation LATEST Posted Dec 09, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Sep 02, 2025Dec 09, 2025

Details

Solicitation number SPRDL1-25-Q-0156
Notice ID aded3049daf64b918cd01618e5322d03
Notice type Solicitation
Product / Service (PSC) 5998
NAICS 334418
Archive date Dec 24, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Alexandra Stone

Email

Phone

Agency

DEPT OF DEFENSE
DEFENSE LOGISTICS AGENCY
DLA LAND
DLA LAND WARREN MICHIGAN
DLA LAND WARREN

Dates

Posted Dec 09, 2025 7 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 09, 2025 7 months ago