Electrical Work at the Bridger Plant Materials Center, Bridger, Montana 12FPC326Q0002
Summary
AI-generated · Feb 18, 2026Provide electrical installation work to upgrade and extend three-phase power at the Bridger Plant Materials Center to serve a forklift charging outlet and a new walk-in seed cooler. The project includes running exterior conduit from the main distribution panel to an interior wall behind the cooler (about 65 feet; 25 feet from the 100A panel to the cooler disconnect), installing a new 100A three-phase service feed to a new 100A three-phase panel beside the forklift receptacle, and using metal EMT with copper THHN conductors. The old forklift breaker from the outdoor panel will be removed and replaced with a new 100A three-phase breaker, with the forklift disconnect re-fed from the new subpanel to the existing receptacle (all wiring and conduit as required).
Also required are the electrical connections for the walk-in cooler: install surface-mount conduit from the new subpanel to the cooler area, install a service disconnect for the cooler, and wire from that disconnect to the pre-wired control panel on the cooler. Startup and testing of the cooler will be performed by a separate HVAC contractor provided by the owner. Dispose of all removed materials, clean the work areas, and ensure completion within 30 calendar days of award, with a one-year warranty on all materials and workmanship.
Please see Attaachment 1 Statement of Work for further detailed description of services. This work is for the United States Department of Agriculture - Natural Resources Conservation Service (NRCS) Bridger Plant Materials Center (PMC), located at 98 South River Rd., Bridger, MT 59014-9718. The work is to run three-phase power from the main distribution panel to a subpanel, to power an existing outlet for charging a forklift and to install a new connection for the new walk-in seed cooler. The Contractor shall: Install conduit on the exterior of the building from the main distribution panel (MDP) unit to the interior wall behind the walk-in cooler, an approximate distance of 65 feet (from the 100amp panel to the disconnect of the cooler is a total of 25 feet). The exterior wall is tin with insulation and osb/plywood; interior walls are tin with insulation. Install a 100amp three-phase service feed from the MDP to a new 100amp three-phase panel located next to the existing electric forklift receptacle. Conduit raceway will be metal EMT and Wire conductors will be copper THHN. Remove the forklift breaker from the outdoor MDP and install a new 100amp Three Phase breaker in place. Re-feed the forklift disconnect out of the new 100amp sub panel to the existing forklift receptable, installing new solid conduit, wiring, and receptacle if required. Subpanel is 3 feet from the forklift. Provide for electrical wiring of the Walk-in Cooler. Install a surface mount conduit from the new Three Phase sub panel to the Walk-in Cooler area. Install a service disconnect switch for the Walk-in Cooler. Wire from the service disconnect to the already pre-wired control panel located on the Walk-in Cooler. Note: Start up and testing of the Walk-in Cooler to be done by a separate HVAC Contractor provided by the owner. Dispose or recycle all materials removed from the site. Clean all spaces associated with the work. Timely completion of deliverables is essential to a successful outcome. All work must be completed within 30 calendar days of the contract being awarded. All the materials and work required and performed by the contractors must be warrantied for one year from the date of completion of the project.
From Combined Synopsis/Solicitation posted on Feb 17, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Feb 17, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA