Electrical Subpanel Replacement 19PE5026R0001
Summary
AI-generated · May 23, 2026Replace the existing electrical subpanel at the INL warehouse (Air Wing #2) located at the FAP Base Callao, Lima, Peru. Provide all labor, materials, equipment, engineering, quality control, safety oversight, and supervision needed to complete the subpanel replacement. Deliver a safe, code-compliant, fully commissioned system with complete documentation and ensure minimal operational disruption.
This contract is to provide all labor, materials, equipment, engineering, quality control, safety oversight, and supervision necessary to replace the existing electrical subpanel at the INL warehouse (Air Wing #2) located at the FAP Base Callao, Lima, Peru. The Contractor shall deliver a safe, code-compliant, fully commissioned system with complete documentation and minimal operational disruption.
From Combined Synopsis/Solicitation posted on May 22, 2026This contract is to provide all labor, materials, equipment, engineering, quality control, safety oversight, and supervision necessary to replace the existing electrical subpanel at the INL warehouse (Air Wing #2) located at the FAP Base Callao, Lima, Peru. The Contractor shall deliver a safe, code-compliant, fully commissioned system with complete documentation and minimal operational disruption.
From Combined Synopsis/Solicitation posted on Jun 05, 2026Notice history
2-
Combined Synopsis/Solicitation Posted May 22, 2026
-
Combined Synopsis/Solicitation LATEST Posted Jun 05, 2026View changes (1)
- Response Deadline: Jun 08, 2026 → Jun 10, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
PER