Electric Arc Furnace removal ,acquisition and installation W519TC26R028
Summary
AI-generated · Apr 30, 2026Procure and implement a complete upgrade to install a 5-ton Electric Arc Furnace (with option for a second), including all design engineering, specification development, and project management, plus installation, concrete and construction work, equipment commissioning, and training. The package also covers procurement of supporting equipment: a bag house dust collection system, compressed air and Argon storage tanks, and one 5-ton AOD system. Demolition and removal of the existing 5-ton Arc furnace are required, along with site preparation and integration of all systems.
Review attachments for full requirements. A site visit will be held to review site conditions; bidders should plan to participate.
U.S. Army Contracting Command - Rock Island (ACC-RI) has a requirement to provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. Please review attachments for complete requirement. Note a site visit for this requirement is scheduled for 8 May 2026 at 8am.
From Combined Synopsis/Solicitation posted on Apr 29, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA