EGYN211002 Repair Electrical Transformers EGYN211002
Summary
AI-generated · Jan 28, 2026An architectural/engineering design firm is needed to provide TITLE I design services to develop a comprehensive A/E design and an Issued For Construction (IFC) package for replacing eighteen transformers at buildings B820 and B830. The firm must evaluate site conditions for demolishing the existing transformers and installing new ones with medium-voltage primaries and various secondaries (208 V to 4160 V), and create an IFC package that includes a strategy for accessing materials in and out of the buildings.
Deliverables include the complete IFC construction documents with drawings, specifications, a Construction Statement of Work (SOW), a submittal register, an estimate of probable construction cost, and a design analysis. The A/E must conduct site investigations, review as-built drawings, hold design review meetings with Government stakeholders, and ensure all designs comply with the DoD Building Code UFC-1-200-01 and related Unified Facilities Criteria (UFC).
The A/E Design Firm shall provide all TITLE I Design Services required to develop a comprehensive A/E design and a complete Issued For Construction (IFC) set of documents. The contractor is to evaluate site conditions for the replacement of eighteen (18) transformers located in B820 and B830. These transformers have medium voltage primaries with various secondary voltages ranging from 208 volts to 4160 volts. The resulting IFC construction documents shall be for the demolition of existing transformers and the installation of new transformers, including a strategy for overcoming conflicts of getting the materials in and out of the buildings. The complete IFC package shall include drawings, specifications, a construction Statement of Work (SOW), a submittal register, an estimate of probable construction cost, and a Design Analysis. The A/E shall also conduct site investigations, review as-built drawings, hold design review meetings with Government stakeholders, and ensure all designs conform with DoD Building Code (UFC-1-200-01) and all associated Unified Facilities Criteria (UFC).
From Sources Sought posted on Jan 27, 2026Notice history
1-
Sources Sought LATEST Posted Jan 27, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone