ECS Bay Lifts FA857126R0001
Summary
AI-generated · Oct 22, 2025Provide two Environmental Control System (ECS) Bay Lifts (Low Profile Double Pantographs) to the 402d Aircraft Maintenance Group at Robins AFB, Georgia. This is a brand-name, sole-source commercial acquisition; supply all tools, parts, materials, equipment, and transportation.
Before fabrication, submit approval drawings in PDF to the Government POCs at Robins AFB for review. Drawings must be sent within five weeks after award, and the Government will review and approve within two weeks of receipt. Manufacture the two lifts within fourteen weeks of award, and ship them (FOB Destination) no later than fourteen weeks after award, in accordance with the supplier’s commercial packaging recommendations.
This is a Brand Name, Sole Source commercial acquisition. The Contractor shall provide all the tools, parts, materials, equipment, and transportation for two (2) each of the Environmental Control System (ECS) Bay Lifts (Low Profile Double Pantographs) to the 402d Aircraft Maintenance Group (AMXG) at Robins Air Force Base (AFB), Georgia. The Contractor shall provide approval drawings to the Government for review prior to beginning fabrication of the ECS Bay LIfts. The Contractor shall electronically send the drawings in Adobe Portable Document Format (PDF) to the Government Point of Contacts (POCs) at Robins AFB within five (5) weeks after contract award. The Government shall review the drawings and approve them within two (2) weeks of receiving the drawings. The Contractor shall manufacture the Bay Lifts within fourteen (14) weeks. Shipping/Delivery: The Contractor shall ship the products according to their commercial package recommendations no later than fourteen (14) weeks after contract award. Delivery will be FOB Destination.
From Combined Synopsis/Solicitation posted on Oct 21, 2025Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Oct 21, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA