Dry Chemical HAZMAT Locker System Replacement at U.S. Coast Guard Sector San Diego 37250PR250000236
Summary
AI-generated · Sep 03, 2025Replace and install six Pyrochem MONARCH dry chemical hazmat locker systems at USCG Sector San Diego (2710 North Harbor Drive). Remove the existing system release, cylinder, supply line, nozzle, pull station, and pressure switch at each hazmat room; install MONARCH components in each room including the MCH3 mechanical release with CO2 actuation cartridge and MB-2 bracket, PCL-17ABC cylinder with MB-15 bracket, explosion-proof pressure switch, 3/4" galvanized supply line with NV-ABC nozzle, and RPS-M remote pull station, along with updated mechanical detection and the bracketing/supports per the MONARCH manual.
Site constraints and contractor requirements include using explosion-proof pressure switches in lieu of micro switches for electrical interlocks (with per-system charges), and that devices such as contactors, shunt trips, solenoids, fans, relays, and power wiring related to the systems are by others, with Monarch wiring handled by others. Installation must occur during normal business hours (7:00 am–3:30 pm); safe-off and reconnection of electrical systems and sealing of penetrations in cabinets are the responsibility of others. A NICET III stamped suppression plan covering all six systems is required; separate suppression plans for individual systems will incur additional charges, and permit/plan review fees, if assessed, will be reimbursed at cost. The work replaces unsupported systems due to multiple deficiencies identified across buildings 66509–66514, with the replacement using a currently supported product line. Site visits can be scheduled through the designated facilities engineer.
Replace and Install 06 Hazmat Locker Systems at US Coast Guard Sector San Diego: 2710 North Harbor Drive San Diego CA 92101 For site visit please contact: CWO Kyle Kagami, Facilities Engineer Cell: (832) 293-5117 Replacement of the (6) dry chemical hazmat locker systems. Current systems are no longer supported and have multiple deficiencies. Remove the system release, cylinder, supply line, nozzle, pull station and pressure switch at each hazmat room. Install Pyrochem MONARCH dry chemical system components at each hazmat room: 1. MCH3 mechanical release and CO2 actuation cartridge w/MB-2 mounting bracket. 2. PCL-17ABC cylinder w/MB-15 mounting bracket. 3. Explosion proof pressure switch. 4. 3/4" galvanized supply line pipe and a NV-ABC nozzle. 5. RPS-M remote pull station. 6. Update existing mechanical detection. All necessary Bracketing and Supports per the Monarch Manual. Qualifications: Devices such as contactors, shunt trips, solenoids, fans, relays, controls, power, line voltage or building fire alarm tie-in if applicable is by others. Wiring from Monarch micro switches to said devices by others. Add: for one (1) suppression plan and NICET III stamp comprised of all six (6) systems. Individual suppression plans for each system to incur additional charges. Permit/plan review fees if assessed to be reimbursed at cost. Add: per system for explosion proof pressure switches, in lieu of micro switches, for electrical interlocks. Installation to be performed during normal business hours 7am-3:30pm. Electrical connection safe-off and reconnection by others. There are existing penetrations in the cabinets housing the suppression systems. Sealing of the penetration's by others. Services to be completed [Industrial/Dry Chemical Suppression] Location - Building DEFICIENCIES (SYSTEMS ARE NO LONGER SUPPORTED, DUE TO THE TYPE AND QUANTITY OF DEFICINCIES, REPLACEMENT MATERIAL IS NOT AVAILABLE TO CERTIFY SYSTEMS. PROPOSED RESOLUTION IS REPLACEMENT OF SYSTEMS WITH A PRODUCT LINE CURRENTLY SUPPORTED) BLDG 66509: -PULL STATION SEIZED -BELL DID NOT OPERATE -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66510: -BELL DID NOT OPERATE -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66511: -BELL DID NOT OPERATE -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66512: -PRESSURE SWITCH WOULD NOT RESET (WATER DAMAGE) -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66513: -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66514: -CYLINDER LOW ON PRESSURE -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED
From Combined Synopsis/Solicitation posted on Sep 02, 2025Replace and Install 06 Hazmat Locker Systems at US Coast Guard Sector San Diego: 2710 North Harbor Drive San Diego CA 92101 Industry Day Site Visit will be held: Friday, September 12th @0900 Please contact Kyle Kagami, Facilities Engineer Cell: (832) 293-5117 for visitor passes Replacement of the (6) dry chemical hazmat locker systems. Current systems are no longer supported and have multiple deficiencies. Remove the system release, cylinder, supply line, nozzle, pull station and pressure switch at each hazmat room. Install Pyrochem MONARCH dry chemical system components at each hazmat room: 1. MCH3 mechanical release and CO2 actuation cartridge w/MB-2 mounting bracket. 2. PCL-17ABC cylinder w/MB-15 mounting bracket. 3. Explosion proof pressure switch. 4. 3/4" galvanized supply line pipe and a NV-ABC nozzle. 5. RPS-M remote pull station. 6. Update existing mechanical detection. All necessary Bracketing and Supports per the Monarch Manual. Qualifications: Devices such as contactors, shunt trips, solenoids, fans, relays, controls, power, line voltage or building fire alarm tie-in if applicable is by others. Wiring from Monarch micro switches to said devices by others. Add: for one (1) suppression plan and NICET III stamp comprised of all six (6) systems. Individual suppression plans for each system to incur additional charges. Permit/plan review fees if assessed to be reimbursed at cost. Add: per system for explosion proof pressure switches, in lieu of micro switches, for electrical interlocks. Installation to be performed during normal business hours 7am-3:30pm. Electrical connection safe-off and reconnection by others. There are existing penetrations in the cabinets housing the suppression systems. Sealing of the penetration's by others. Services to be completed [Industrial/Dry Chemical Suppression] Location - Building DEFICIENCIES (SYSTEMS ARE NO LONGER SUPPORTED, DUE TO THE TYPE AND QUANTITY OF DEFICINCIES, REPLACEMENT MATERIAL IS NOT AVAILABLE TO CERTIFY SYSTEMS. PROPOSED RESOLUTION IS REPLACEMENT OF SYSTEMS WITH A PRODUCT LINE CURRENTLY SUPPORTED) BLDG 66509: -PULL STATION SEIZED -BELL DID NOT OPERATE -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66510: -BELL DID NOT OPERATE -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66511: -BELL DID NOT OPERATE -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66512: -PRESSURE SWITCH WOULD NOT RESET (WATER DAMAGE) -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66513: -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED BLDG 66514: -CYLINDER LOW ON PRESSURE -HOSE REQUIRES HYDROSTATIC TESTING -6 YEAR MAINTENANCE REQUIRED -12 YEAR HYDROTEST REQUIRED
From Combined Synopsis/Solicitation posted on Sep 09, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Sep 09, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA