Contacts, documents and full notice history are available with a subscription.
Special Notice 8A 3 notices 2 documents

DRAFT Statement of Work- Fort Belvoir Roofing SATOC IDIQ W5168W-24-R-0022

Solicitation W5168W-24-R-0022 Copied Notice ID fd333df5b0514fd2adb478857ebe9e19 Copied DEPT OF DEFENSE — W6QM MICC-FDO FT SAM HOUSTON
SAM.gov
Posted
Jun 18, 2025
Deadline
No deadline
Set-aside
8A
NAICS
238160
PSC
Z2JZ

Summary

AI-generated · Aug 23, 2025

Furnish all labor, equipment, and materials to remove, install, repair, seal, and/or replace roofing on Fort Belvoir buildings in VA, including incidental work, to achieve a complete, functional, and suitable roofing system per the statement of work (SOW). The effort is under a SATOC/IDIQ arrangement, so work will be issued as task orders across multiple buildings as needed, with performance governed by the SOW.

Updates show progression from a draft SOW to a formal solicitation, including a change in the contract/ID from W5168W-24-R-0022 to W5168W-25-R-0026 and the posting of the Fort Belvoir Roofing SATOC IDIQ RFP as W5168W-25-R-A005. A prior site-visit was held with Q&A published, and two SOW references were updated to the Unified Facilities Guide Specifications (UFGS) and Unified Facilities Criteria (UFC). Monitor Sam.gov for the latest posting and procurement milestones.

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. ___________________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ____________________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ____________________________________________________________ Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates. ___________________________________________________________ Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _______________________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. ________________________________________________________________ Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _______________________________________________________________ Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. ________________________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. _________________________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. __________________________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.

From Special Notice posted on Jun 18, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. __________________________________________________________ Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ____________________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ____________________________________________________________ Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates. ___________________________________________________________ Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _______________________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. ________________________________________________________________ Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _______________________________________________________________ Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. ________________________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. _________________________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. __________________________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.

From Special Notice posted on Jul 10, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. Update as of 15 JUL 2025: The solicitation has been posted as: Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005. __________________________________________________________ Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ____________________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ____________________________________________________________ Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates. ___________________________________________________________ Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _______________________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. ________________________________________________________________ Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _______________________________________________________________ Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. ________________________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. _________________________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. __________________________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.

From Special Notice posted on Jul 15, 2025

Notice history

3
  1. Special Notice Posted Jun 18, 2025
  2. Special Notice Posted Jul 10, 2025
    • Description: Description was updated
  3. Special Notice LATEST Posted Jul 15, 2025
    • Description: Description was updated

Details

Solicitation number W5168W-24-R-0022
Notice ID fd333df5b0514fd2adb478857ebe9e19
Notice type Special Notice
Product / Service (PSC) Z2JZ
NAICS 238160
Place of performance Fort Belvoir, Virginia
Archive date Jan 30, 2026

Award Information

Not yet awarded

Contacts

primary
Melanie Palmas

Email

secondary
Douglas Buffington

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
W6QM MICC-FDO FT SAM HOUSTON

Place of Performance

Fort Belvoir, Virginia
USA

Dates

Posted Jun 18, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago