Draft RFP Notice - W9128F25RA065 - $699M Small Business Design-Build/Design-Bid-Build Fuels MATOC W9128F25RA065
Summary
AI-generated · Aug 24, 2025Design and construction work for POL fuel storage complexes, or portions thereof, in support of fuel distribution systems, as identified in Table 1 SPECIALIZED WORK of Attachment 6. Task-order projects will include fuel-system design services, inspection services, and other services needed to complete each task-order construction project. This is a small-business MATOC offering design-build or design-bid-build, with attachments outlining the specialized work and instructions for commenting on the Draft RFP.
Update: attachments were not changed; new information clarifies that a PIEE Solicitation Module Link must be used to access all attachments from SAM.gov for W9128F25RA065.
The work includes design and construction work identified in Table 1 SPECIALIZED WORK of Attachment 6 for Petroleum Oil and Lubricants (POL) fuel storage complexes, or portions thereof, in support of fuel distribution systems. Task order projects will include fuel system design services, inspection services and other services needed to complete each task order construction project. See the attachment Draft RFP Notice - W9128F25A065 for additional instructions on how to submit comments regarding this Draft RFP and other details.
From Special Notice posted on Jul 21, 2025The work includes design and construction work identified in Table 1 SPECIALIZED WORK of Attachment 6 for Petroleum Oil and Lubricants (POL) fuel storage complexes, or portions thereof, in support of fuel distribution systems. Task order projects will include fuel system design services, inspection services and other services needed to complete each task order construction project. See the attachment Draft RFP Notice - W9128F25A065 for additional instructions on how to submit comments regarding this Draft RFP and other details. Click the link below called PIEE Solicitation Module Link for W9128F25RA065 to access all of the attachments. Update 0001: No changes were made to attachments; Additional info was added to clarify that a link must be used to access all attachments from SAM.gov.
From Special Notice posted on Jul 31, 2025The work includes design and construction work identified in Table 1 SPECIALIZED WORK of Attachment 6 for Petroleum Oil and Lubricants (POL) fuel storage complexes, or portions thereof, in support of fuel distribution systems. Task order projects will include fuel system design services, inspection services and other services needed to complete each task order construction project. See the attachment Draft RFP Notice - W9128F25A065 for additional instructions on how to submit comments regarding this Draft RFP and other details. Click the link below called PIEE Solicitation Module Link for W9128F25RA065 to access all of the attachments. Update 0001: No changes were made to attachments; Additional info was added to clarify that a link must be used to access all attachments from SAM.gov. The new solicitation number for this action is W9128F26RA024. Search contracting opportunities on SAM to find the Pre-Solicitation Notice.
From Special Notice posted on Sep 23, 2025Notice history
3Details
Award Information
Not yet awarded