Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 3 notices

Diesel Powered Portable Skid Mounted Enclosed Generators & Maintenance N0040625QS563

Solicitation N0040625QS563 Copied Notice ID ec87b3d9602348f3bf889acf88aa0d3a Copied DEPT OF DEFENSE — STRATEGIC WEAPONS FAC PAC FINANCIAL
SAM.gov
Posted
Aug 26, 2025
Deadline
Sep 03, 2025
Set-aside
SBA
NAICS
238210
PSC
6115

Summary

AI-generated · Aug 27, 2025

Two enclosed, diesel-powered portable skid-mounted generator sets (50 kW each) are required for USCG Airstation Port Angeles. Each unit must be a three-phase, 480 VAC/277 VAC system with a continuous rating of 50 kW and a power factor of 0.8, designed for all-season outdoor use in a salt-air environment, with a fully lockable enclosure and drainage. Deliver, unpack, and install in place on concrete pads, remove the two currently installed 50 kW generators, and provide two 20-foot power cables compatible with the specified transfer switch. The generators must be capable of starting the 7.5 HP three-phase sewage lift pump motor directly across the line without unacceptable voltage drop, and must have the capability to auto-start via an automatic transfer switch for future active capability. Deliverables include electrical connections, on-site operational testing coordinated with a Government POC, and detailed OEM maintenance recommendations. Maintenance must cover on-site OEM-recommended service for 12 months after testing, with an option to extend for one additional year; disposal of the existing equipment and initial operator training plus three operation manuals are included.

New information from the actual solicitation clarifies the full scope and requirements: two generators are required (not just a generic equipment purchase), removal of the existing units, and installation, testing, and on-site maintenance are specified with a six-month delivery window from award. The contract also requires on-site disposal of current generators, two power cables (20 ft each), and confirmation that the equipment will operate under the listed transient loading while maintaining acceptable voltage performance. Proposals require registration in SAM to participate, and the work includes a six-month delivery period, on-site installation and testing, equipment 12-month maintenance with a one-time extension option, and associated training and manuals.

NAVSUP FLC Puget Sound, in support of Strategic Weapons Facility Pacific (SWFPAC), will be soliciting for a firm fixed price contract for Diesel Powered Portable Skid Mounted Enclosed Generators and Maintenance in accordance with the solicitation Statement of Work. The anticipated posting date of the solicitation is on or about 8/27/2025 with a closing date on or about 9/3/2025. Requirement is being procured using FAR Parts 12 and 13 Procedures. Electronic submission of proposals/quotes through the System for Awards Management (SAM) website is not available at this time. This solicitation and any subsequent amendments will be posted on the SAM Website: https://sam.gov/ Interested persons may identify their interest and capability to respond to the requirement or submit proposals prior to offer due date, which will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. A determination not to compete this action based upon responses received to this notice is solely within the discretion of the Government. Prospective offerors are responsible for downloading their own copy of the solicitation from this website and for frequently monitoring that site for any amendments. The Government is not responsible for any inability of the offeror to access the posted documents. Prospective offerors must be registered in SAM to participate in this procurement. No telephone or FAX requests will be accepted, and no hard-copy solicitation/amendment will be mailed or FAXed. Offerors must also be registered in the System for Awards Management (SAM) in order to receive a Government Award in this procurement at https://sam.gov. All questions regarding this solicitation should be submitted to the Contracting Specialist, Tabbatha Austin at Tabbatha.austin@swfpac.navy.mil or the Contracting Officer, denise.e.manor.civ@us.navy.mil. ***DESCRIPTION OF ITEMS/SERVICE WILL BE POSTED AT THE TIME SOLICITATION IS POSTED***

From Presolicitation posted on Aug 26, 2025

Diesel Powered Portable Skid Mounted Enclosed Generators Statement of Work Strategic Weapons Facility Pacific (SWFPAC), Code SPB14 Scope of Work: The contractor shall provide, unpack and deliver in-place two (2), enclosed Diesel Powered Portable Skid Mounted Generator-Sets with power cable connections to United States Coast Guard Airstation/SFO Port Angeles, 1 Ediz Hook Road, Port Angeles, WA 98362. Prior to delivery contractor shall remove and dispose of (2) currently installed 50kW generators. Contractor shall coordinate delivery, installation, connection and operational testing of (2) new generators with Government Point of Contact (POC). Contractor shall submit detailed specifications and recommended origninal equipment manufacturer (OEM) maintenance for proposed generators. Contractor shall provide 12 months of OEM recommended maintenance following installation and successful testing, to be performed on-site. Maintenance may be extended up to 1 time for an additional 12-month period. Period of Performance: Once awarded, contractor will provide equipment specified by this contract within 6 (six) months from award date. Deliverables: Diesel Generator #1 Rating shall be 50 kW, three phase, four-wire, 480 VAC line voltage, 277 VAC phase voltage, with a continuous power factor of 0.8. The load under normal conditions is approximately 18 kW. A single 7.5 horsepower three-phase sewage lift pump motor will be called upon intermittently as an addition to this normal load. Contractor may recommend a diesel-generator rating lower than the recommended 50 kW @ PF=0.8 is viable to avoid unnecessary 'wet-stacking' of the diesel during times when the lift pump is not operating, i.e., 18 kW. Contractor shall provide connection cable compatible with transfer switch in Enclosure (1). Diesel-generator shall be able to start sewage lift pump motor directly across the line without causing an unacceptable voltage drop to the system. The specific technical cut sheets for the sewage lift pump motor are attached as Enclosure (2). Diesel-generator shall have the capability to auto-start via an automatic transfer bus/switch for future capability. Diesel Generator #2 Rating shall be 50 kW, three phase, four-wire, 480 VAC line voltage, 277 VAC phase voltage, with a continuous power factor of 0.8. The load under normal conditions is approximately 18 kW. A single 7.5 horsepower three-phase sewage lift pump motor will be called upon intermittently as an addition to this normal load. Contractor may recommend a diesel-generator rating lower than the recommended 50 kW @ PF=0.8 is viable to avoid unnecessary 'wet-stacking' of the diesel during times when the lift pump is not operating, i.e., 18 kW. Contractor shall provide connection cable compatible with transfer switch in Enclosure (1). Diesel-generator shall be able to start sewage lift pump motors directly across the line simultaneously without causing an unacceptable voltage drop to the system. The specific technical cut sheets for the sewage lift pump motors are attached as Enclosure (3). Diesel-generator shall have the capability to auto-start via an automatic transfer bus/switch for future capability. Power Cable Connections Provide 2 power cables, one for each generator. Power cables shall be of an appropriate rating such that they can handle the full capacity of the generators. Cables shall be compatible with the transfer switch connection specified in Enclosure (1). Cables shall be at least 20 feet in length. Equipment provided shall meet or exceed the following requirements: Generator shall be an all season operating system, portable diesel-generator set designed and constructed for outdoor use in the Pacific Northwest region, situated in an environment adjacent to salt-water and unshielded from all potential types of weather including windblown rain and snow. Enclosure to have drainage. Generator shall have a fully lockable enclosure to allow safe unattended operation. All aspects of their diesel-generator set including the excitation equipment, voltage regulator, and governor will perform properly under the following transient loading conditions: Assume that the diesel-generator set is supplying a steady-state load of 35 kW (44 kVA @ P.F. = 0.8) at which time the sewage lift pump induction motor (480 VAC, three-phase, 7.5 horsepower) starts directly across the line at full voltage, i.e., without soft-starting equipment. The generator shall be capable of running for an indefinite period of time with the 'normal' phase imbalance of Phase A=9.26 kW, Phase B=7.24 kW, Phase C=1.59 kW in addition to the lift pump motor in Enclosure (1) running and will not cause damaging negative sequence heating beyond the generator thermal capabilities. Generator shall have a tank capacity to support at least 12 hours of continuous, full rate operation before refueling is required. Maintenance Description Maintenance shall include but it not limited to the following maintenance actions: Monthly operational check of at least 30 min (per OEM guidance) Monthly fluid level check and top off as necessary (per OEM guidance), to include: Fuel Oil Coolant Diesel Exhaust Fluid (if equipped) Once Annual Oil Change Contractor shall be responsible for providing all consumables and proper disposal of all waste. Disposal Contractor shall dispose of currently installed generators in accordance with all applicable federal and state regulation. Install Contractor will deliver generators to the site locations at the specified address. Contractor will place and secure the generator to the designated concrete pads. Contractor will make all required electrical connections for operation. Contractor will fill fuel and check all required fluids and fill to the OEMS specification. Operational Test Contractor will coordinate with the Government POC to conduct operational load test of newly install generators. Contractor will provide initial operator training and (3) operation manuals. Contractor will run and oversee initial operation of generators during operational test.

From Solicitation posted on Aug 26, 2025

Diesel Powered Portable Skid Mounted Enclosed Generators Statement of Work Strategic Weapons Facility Pacific (SWFPAC), Code SPB14 Scope of Work: The contractor shall provide, unpack and deliver in-place two (2), enclosed Diesel Powered Portable Skid Mounted Generator-Sets with power cable connections to United States Coast Guard Airstation/SFO Port Angeles, 1 Ediz Hook Road, Port Angeles, WA 98362. Prior to delivery contractor shall remove and dispose of (2) currently installed 50kW generators. Contractor shall coordinate delivery, installation, connection and operational testing of (2) new generators with Government Point of Contact (POC). Contractor shall submit detailed specifications and recommended origninal equipment manufacturer (OEM) maintenance for proposed generators. Contractor shall provide 12 months of OEM recommended maintenance following installation and successful testing, to be performed on-site. Maintenance may be extended up to 1 time for an additional 12-month period. Period of Performance: Once awarded, contractor will provide equipment specified by this contract within 6 (six) months from award date. Deliverables: Diesel Generator #1 Rating shall be 50 kW, three phase, four-wire, 480 VAC line voltage, 277 VAC phase voltage, with a continuous power factor of 0.8. The load under normal conditions is approximately 18 kW. A single 7.5 horsepower three-phase sewage lift pump motor will be called upon intermittently as an addition to this normal load. Contractor may recommend a diesel-generator rating lower than the recommended 50 kW @ PF=0.8 is viable to avoid unnecessary 'wet-stacking' of the diesel during times when the lift pump is not operating, i.e., 18 kW. Contractor shall provide connection cable compatible with transfer switch in Enclosure (1). Diesel-generator shall be able to start sewage lift pump motor directly across the line without causing an unacceptable voltage drop to the system. The specific technical cut sheets for the sewage lift pump motor are attached as Enclosure (2). Diesel-generator shall have the capability to auto-start via an automatic transfer bus/switch for future capability. Diesel Generator #2 Rating shall be 50 kW, three phase, four-wire, 480 VAC line voltage, 277 VAC phase voltage, with a continuous power factor of 0.8. The load under normal conditions is approximately 18 kW. A single 7.5 horsepower three-phase sewage lift pump motor will be called upon intermittently as an addition to this normal load. Contractor may recommend a diesel-generator rating lower than the recommended 50 kW @ PF=0.8 is viable to avoid unnecessary 'wet-stacking' of the diesel during times when the lift pump is not operating, i.e., 18 kW. Contractor shall provide connection cable compatible with transfer switch in Enclosure (1). Diesel-generator shall be able to start sewage lift pump motors directly across the line simultaneously without causing an unacceptable voltage drop to the system. The specific technical cut sheets for the sewage lift pump motors are attached as Enclosure (3). Diesel-generator shall have the capability to auto-start via an automatic transfer bus/switch for future capability. Power Cable Connections Provide 2 power cables, one for each generator. Power cables shall be of an appropriate rating such that they can handle the full capacity of the generators. Cables shall be compatible with the transfer switch connection specified in Enclosure (1). Cables shall be at least 20 feet in length. Equipment provided shall meet or exceed the following requirements: Generator shall be an all season operating system, portable diesel-generator set designed and constructed for outdoor use in the Pacific Northwest region, situated in an environment adjacent to salt-water and unshielded from all potential types of weather including windblown rain and snow. Enclosure to have drainage. Generator shall have a fully lockable enclosure to allow safe unattended operation. All aspects of their diesel-generator set including the excitation equipment, voltage regulator, and governor will perform properly under the following transient loading conditions: Assume that the diesel-generator set is supplying a steady-state load of 35 kW (44 kVA @ P.F. = 0.8) at which time the sewage lift pump induction motor (480 VAC, three-phase, 7.5 horsepower) starts directly across the line at full voltage, i.e., without soft-starting equipment. The generator shall be capable of running for an indefinite period of time with the 'normal' phase imbalance of Phase A=9.26 kW, Phase B=7.24 kW, Phase C=1.59 kW in addition to the lift pump motor in Enclosure (1) running and will not cause damaging negative sequence heating beyond the generator thermal capabilities. Generator shall have a tank capacity to support at least 12 hours of continuous, full rate operation before refueling is required. Maintenance Description Maintenance shall include but it not limited to the following maintenance actions: Monthly operational check of at least 30 min (per OEM guidance) Monthly fluid level check and top off as necessary (per OEM guidance), to include: Fuel Oil Coolant Diesel Exhaust Fluid (if equipped) Once Annual Oil Change Contractor shall be responsible for providing all consumables and proper disposal of all waste. Disposal Contractor shall dispose of currently installed generators in accordance with all applicable federal and state regulation. Install Contractor will deliver generators to the site locations at the specified address. Contractor will place and secure the generator to the designated concrete pads. Contractor will make all required electrical connections for operation. Contractor will fill fuel and check all required fluids and fill to the OEMS specification. Operational Test Contractor will coordinate with the Government POC to conduct operational load test of newly install generators. Contractor will provide initial operator training and (3) operation manuals. Contractor will run and oversee initial operation of generators during operational test.

From Solicitation posted on Aug 29, 2025

Notice history

3
  1. Presolicitation Posted Aug 26, 2025
  2. Solicitation Posted Aug 26, 2025
    • Title: Diesel Powered Portable Skid Mounted Enclosed Generators & MaintenanceDiesel Powered Portable Skid Mounted Enclosed Generators and Maintenance
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
  3. Solicitation LATEST Posted Aug 29, 2025
    No changes from previous notice

Details

Solicitation number N0040625QS563
Notice ID ec87b3d9602348f3bf889acf88aa0d3a
Notice type Presolicitation
Product / Service (PSC) 6115
NAICS 238210
Place of performance Silverdale, Washington
Archive date Sep 18, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Tabbatha Austin

Email

Phone

secondary
Denise Manor

Email

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
SSP
STRATEGIC WEAPONS FAC PAC FINANCIAL

Place of Performance

Silverdale, Washington 98315
USA

Dates

Posted Aug 26, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 03, 2025 11 months ago