DESIGN BUILD CONSTRUCTION FOR UTILITY INFRASTRUCTURE, ROADS & CLINIC AT USCG BASE CHARLESTON, SOUTH CAROLINA 70Z04725RPCNI0007
Summary
AI-generated · Aug 24, 2025Design-build construction at USCG Base Charleston, South Carolina includes a new Entry Control Point/Main Gate with a guard house and visitor check-in, plus the installation of site utilities for the new facilities. It also requires constructing a Medical/Dental Facility to provide all clinic functions, as well as offices and counseling spaces for the Work Life staff. The ground floor of the clinic will be open to allow storm surge to flow through and minimize natural-disaster damage, and the building will employ high-performance, energy-efficient, sustainable design using a whole-building integrated approach and High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable, in compliance with the Guiding Principles for Sustainable Federal Buildings (2020). Work must be completed in accordance with RFP Specification Section 01800, Paragraph 1.1.1 and the government-accepted, contractor-originated drawings.
Records 1–6 describe the same project scope; no substantive changes are indicated between notices. Bidders should prepare to respond to a design-build solicitation covering both site utilities and the medical/dental facility, under the same integrated contract, per the stated specifications and drawings.
This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Life staff. The ground floor of this medical/dental clinic shall be primarily open to allow storm surge to flow through the building's ground floor and minimize natural disaster damage. The Medical/Dental Clinic. Building shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a whole building integrated design approach. This medical/dental facility shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable and comply with the Guiding Principles for Sustainable Federal Buildings (2020). The Guiding Principles ensure Federal Buildings: (1) Employ Integrated Design Principles (2) Optimize Energy Performance (3) Protect and Conserve Enhance the Indoor Environment (4) Reduce the Environmental Impact of Materials (5) Assess and Consider Building Resilience; RFP Specification Section 01800, Paragraph 1.1.1 for a project description. The contractor shall complete work according to this specification and as shown on the Government-accepted, Contractor originated drawings.
From Solicitation posted on Jul 11, 2025This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Life staff. The ground floor of this medical/dental clinic shall be primarily open to allow storm surge to flow through the building's ground floor and minimize natural disaster damage. The Medical/Dental Clinic. Building shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a whole building integrated design approach. This medical/dental facility shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable and comply with the Guiding Principles for Sustainable Federal Buildings (2020). The Guiding Principles ensure Federal Buildings: (1) Employ Integrated Design Principles (2) Optimize Energy Performance (3) Protect and Conserve Enhance the Indoor Environment (4) Reduce the Environmental Impact of Materials (5) Assess and Consider Building Resilience; RFP Specification Section 01800, Paragraph 1.1.1 for a project description. The contractor shall complete work according to this specification and as shown on the Government-accepted, Contractor originated drawings.
From Solicitation posted on Jul 22, 2025This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Life staff. The ground floor of this medical/dental clinic shall be primarily open to allow storm surge to flow through the building's ground floor and minimize natural disaster damage. The Medical/Dental Clinic. Building shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a whole building integrated design approach. This medical/dental facility shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable and comply with the Guiding Principles for Sustainable Federal Buildings (2020). The Guiding Principles ensure Federal Buildings: (1) Employ Integrated Design Principles (2) Optimize Energy Performance (3) Protect and Conserve Enhance the Indoor Environment (4) Reduce the Environmental Impact of Materials (5) Assess and Consider Building Resilience; RFP Specification Section 01800, Paragraph 1.1.1 for a project description. The contractor shall complete work according to this specification and as shown on the Government-accepted, Contractor originated drawings.
From Solicitation posted on Jul 25, 2025This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Life staff. The ground floor of this medical/dental clinic shall be primarily open to allow storm surge to flow through the building's ground floor and minimize natural disaster damage. The Medical/Dental Clinic. Building shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a whole building integrated design approach. This medical/dental facility shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable and comply with the Guiding Principles for Sustainable Federal Buildings (2020). The Guiding Principles ensure Federal Buildings: (1) Employ Integrated Design Principles (2) Optimize Energy Performance (3) Protect and Conserve Enhance the Indoor Environment (4) Reduce the Environmental Impact of Materials (5) Assess and Consider Building Resilience; RFP Specification Section 01800, Paragraph 1.1.1 for a project description. The contractor shall complete work according to this specification and as shown on the Government-accepted, Contractor originated drawings.
From Solicitation posted on Aug 08, 2025This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Life staff. The ground floor of this medical/dental clinic shall be primarily open to allow storm surge to flow through the building's ground floor and minimize natural disaster damage. The Medical/Dental Clinic. Building shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a whole building integrated design approach. This medical/dental facility shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable and comply with the Guiding Principles for Sustainable Federal Buildings (2020). The Guiding Principles ensure Federal Buildings: (1) Employ Integrated Design Principles (2) Optimize Energy Performance (3) Protect and Conserve Enhance the Indoor Environment (4) Reduce the Environmental Impact of Materials (5) Assess and Consider Building Resilience; RFP Specification Section 01800, Paragraph 1.1.1 for a project description. The contractor shall complete work according to this specification and as shown on the Government-accepted, Contractor originated drawings.
From Solicitation posted on Aug 14, 2025This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Life staff. The ground floor of this medical/dental clinic shall be primarily open to allow storm surge to flow through the building's ground floor and minimize natural disaster damage. The Medical/Dental Clinic. Building shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a whole building integrated design approach. This medical/dental facility shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable and comply with the Guiding Principles for Sustainable Federal Buildings (2020). The Guiding Principles ensure Federal Buildings: (1) Employ Integrated Design Principles (2) Optimize Energy Performance (3) Protect and Conserve Enhance the Indoor Environment (4) Reduce the Environmental Impact of Materials (5) Assess and Consider Building Resilience; RFP Specification Section 01800, Paragraph 1.1.1 for a project description. The contractor shall complete work according to this specification and as shown on the Government-accepted, Contractor originated drawings.
From Solicitation posted on Aug 15, 2025This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Life staff. The ground floor of this medical/dental clinic shall be primarily open to allow storm surge to flow through the building's ground floor and minimize natural disaster damage. The Medical/Dental Clinic. Building shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a whole building integrated design approach. This medical/dental facility shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable and comply with the Guiding Principles for Sustainable Federal Buildings (2020). The Guiding Principles ensure Federal Buildings: (1) Employ Integrated Design Principles (2) Optimize Energy Performance (3) Protect and Conserve Enhance the Indoor Environment (4) Reduce the Environmental Impact of Materials (5) Assess and Consider Building Resilience; RFP Specification Section 01800, Paragraph 1.1.1 for a project description. The contractor shall complete work according to this specification and as shown on the Government-accepted, Contractor originated drawings.
From Solicitation posted on Aug 28, 2025This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Life staff. The ground floor of this medical/dental clinic shall be primarily open to allow storm surge to flow through the building's ground floor and minimize natural disaster damage. The Medical/Dental Clinic. Building shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a whole building integrated design approach. This medical/dental facility shall employ High Performance and Sustainable Building (HPSB) technologies to the maximum extent practicable and comply with the Guiding Principles for Sustainable Federal Buildings (2020). The Guiding Principles ensure Federal Buildings: (1) Employ Integrated Design Principles (2) Optimize Energy Performance (3) Protect and Conserve Enhance the Indoor Environment (4) Reduce the Environmental Impact of Materials (5) Assess and Consider Building Resilience; RFP Specification Section 01800, Paragraph 1.1.1 for a project description. The contractor shall complete work according to this specification and as shown on the Government-accepted, Contractor originated drawings.
From Solicitation posted on Jan 14, 2026Notice history
8-
-
Solicitation Posted Jul 22, 2025No changes from previous notice
-
Solicitation Posted Jul 25, 2025No changes from previous notice
-
Solicitation Posted Aug 15, 2025No changes from previous notice
-
Solicitation Posted Aug 28, 2025No changes from previous notice
-
Solicitation LATEST Posted Jan 14, 2026No changes from previous notice
Details
Award Information
Not yet awarded