Deschutes National Forest - GAOA Forest Wide Trail Bridge Reconstruction 1240BH25Q0022

Solicitation 1240BH25Q0022 Copied Notice ID eef15bbbd6f64134bc607e7db7bcb248 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA NORTHWEST 6
SAM.gov
Posted
Jun 05, 2025
Deadline
Jul 07, 2025
Set-aside
SBA
NAICS
237990
PSC
Y1LB

Summary

AI-generated · Aug 25, 2025

Demolish two existing Multi-Log Stringer Bridges (36 ft and 25 ft) on the Deschutes National Forest, then furnish, fabricate, and treat structural timber and yard lumber to complete the bridge systems, deliver to the site, and install. Provide all necessary anchoring and fastening hardware, structural steel, bearing shoes/pads, stringers, sills, timber curbs, timber railings on both sides, backwall systems, blocking, running planks, and geocell foundation systems to construct two new trail bridges: a 41-foot Glulam Stringer Trail Bridge and a 31-foot Longitudinal Glulam Deck Panel Trail Bridge.

East Cultus Lake Trail Bridge will be constructed using a newly fabricated Glulam Trail Bridge supplied by the contractor, while Todd Meadow Nordic Trail Bridge will be built using a newly furnished Longitudinal Glulam Deck Panel Trail Bridge, also provided by the contractor. Construction at East Cultus Lake will include Overlapping Step Systems, with borrow material placed for the approaches to Todd Meadow Nordic Trail Bridge. The contractor must furnish sawn timber for the Overlapping Step Systems. Project magnitude is between $100,000 and $250,000. This is an informational notice for a blanket purchase agreement call under the Trail Construction and Maintenance BPA 1240BJ21Q0015; this is a continuation under an existing BPA and no new contractors are being sought at this time.

This project involves: This work is taking place on the Deschutes National Forest. The work entails the demolition of two existing Multi-Log Stringer Bridges measuring 36 feet and 25 feet in length. The scope includes furnishing, fabricating, and treating structural timber, along with all required yard lumber to complete the bridge system, followed by delivery and installation at the existing site. The contractor shall provide all necessary anchoring and fastening hardware, structural steel, bearing shoes/pads, stringers, sills, timber curbs, timber railings on both sides, backwall systems, blocking, running planks, and geocell foundation systems for the construction of two new trail bridges a 41-foot Glulam Stringer Trail Bridge and a 31-foot Longitudinal Glulam Deck Panel Trail Bridge. The East Cultus Lake Trail Bridge will be constructed using a newly fabricated Glulam Trail Bridge supplied by the contractor, while the Todd Meadow Nordic Trail Bridge will be built using a newly furnished Longitudinal Glulam Deck Panel Trail Bridge, also provided by the contractor. Construction at the East Cultus Lake Trail Bridge will include Overlapping Step Systems and borrow material will be placed for the approaches to the Todd Meadow Nordic Trail Bridge. The contractor is responsible for furnishing the sawn timber necessary for constructing Overlapping Step Systems. The magnitude of this construction project is between $100,000 and $250,000. THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. This notice is for the issuance of a blanket purchase agreement call request on the Trail Construction and Maintenance BPA 1240BJ21Q0015. THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA. WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME.

From Presolicitation posted on Jun 05, 2025

Notice history

1
  1. Presolicitation LATEST Posted Jun 05, 2025

Details

Solicitation number 1240BH25Q0022
Notice ID eef15bbbd6f64134bc607e7db7bcb248
Notice type Presolicitation
Product / Service (PSC) Y1LB
NAICS 237990
Place of performance Oregon
Archive date Dec 31, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Loren Mein

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA NORTHWEST 6

Place of Performance

Oregon 97701
USA

Dates

Posted Jun 05, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 07, 2025 1 year ago