AI-generated · May 22, 2026Demolish vacant Building 13140 (Thor Dormitory) and remove all associated components and systems, including slabs, interior and exterior structures, roof, doors, windows, and all furnishings and equipment (mechanical, communications, electrical). Ensure all equipment that supports B13140 is removed from the adjacent B13143 Mechanical Support Building. Following demolition, inspect for and remove any asbestos-containing materials (ACM) and lead-based paint (LBP) within or on both buildings and dispose of them properly per the project’s performance work statement.
A mandatory site visit will allow bidders to assess the work. To participate, provide complete attendee information (names, driver licenses, emails, and phone numbers) to the designated contacts by the stated deadline. Attendees must check in at the VSFB Visitor Center to obtain a visitor pass, and a site visit caravan will depart from the Visitor Center at the designated time. There are deadlines for submitting questions and for submitting bids.
The Contractor shall furnish all parts, labor material, equipment, transportation and supervision necessary to demolish vacant Building 13140 Thor Dormitory including slabs, adjacent sidewalks, interior floors, walls, ceilings, exterior walls, roof, interior and exterior doors, windows and all existing equipment (e.g. mechanical, communications, electrical systems) and any furnishings within the building. All equipment supporting B13140 shall be removed from B13143 Mechanical Support Building. Facilities shall be inspected and, if found, all Asbestos Containing Materials (ACM) or lead-based paint (LBP) within or on B13140 and B13143, at Vandenberg SFB, CA, shall be removed and properly disposed of. See Attachment 1 - PWS for more information about the requirement. A site visit is scheduled for Monday, June 1, 2026, at 9:00 AM PDT. To participate, you must submit the full names, driver s license numbers, email addresses, and phone numbers for all attendees to Chase French (chase.french@spaceforce.mil) and Rick Porter (rick.porter.1@spaceforce.mil) via email no later than 2:00 PM PDT on May 27, 2026. On the day of the visit, June 1, 2026, all attendees are required to report to the VSFB Visitor Center between 7:20 AM and 8:20 AM to obtain a visitor pass. Due to potential delays at the visitor center, early arrival is strongly encouraged. Please note that the site visit caravan will depart from the Visitor Center promptly at 8:50 AM. Any questions are due no later than 12:00 PM PDT Friday, June 5, 2026. Quotes are due no later than 12:00 PM PDT Wednesday, June 17, 2026.
From Combined Synopsis/Solicitation posted on May 21, 2026**SITE VISIT MEETING MINUTES ADDED AS NEW ATTACHMENT** **RFI's DUE NLT 1200 PDT ON 5 JUNE 2026** **QUOTES DUE NLT 1200 PDT ON 17 JUNE 2026** The Contractor shall furnish all parts, labor material, equipment, transportation and supervision necessary to demolish vacant Building 13140 Thor Dormitory including slabs, adjacent sidewalks, interior floors, walls, ceilings, exterior walls, roof, interior and exterior doors, windows and all existing equipment (e.g. mechanical, communications, electrical systems) and any furnishings within the building. All equipment supporting B13140 shall be removed from B13143 Mechanical Support Building. Facilities shall be inspected and, if found, all Asbestos Containing Materials (ACM) or lead-based paint (LBP) within or on B13140 and B13143, at Vandenberg SFB, CA, shall be removed and properly disposed of. See Attachment 1 - PWS for more information about the requirement. A site visit is scheduled for Monday, June 1, 2026, at 9:00 AM PDT. To participate, you must submit the full names, driver s license numbers, email addresses, and phone numbers for all attendees to Chase French (chase.french@spaceforce.mil) and Rick Porter (rick.porter.1@spaceforce.mil) via email no later than 2:00 PM PDT on May 27, 2026. On the day of the visit, June 1, 2026, all attendees are required to report to the VSFB Visitor Center between 7:20 AM and 8:20 AM to obtain a visitor pass. Due to potential delays at the visitor center, early arrival is strongly encouraged. Please note that the site visit caravan will depart from the Visitor Center promptly at 8:50 AM. Any questions are due no later than 12:00 PM PDT Friday, June 5, 2026. Quotes are due no later than 12:00 PM PDT Wednesday, June 17, 2026.
From Combined Synopsis/Solicitation posted on Jun 01, 2026**New Quote Due Date is Friday, June 26, 2026 NLT 1400 PDT.** **Quotes shall be valid, at a minimum,120 calendar days from submission deadline.** **NEW RFQ V2 ATTACHMENT INCLUDES ABOVE MENTIONED CHANGES** The Contractor shall furnish all parts, labor material, equipment, transportation and supervision necessary to demolish vacant Building 13140 Thor Dormitory including slabs, adjacent sidewalks, interior floors, walls, ceilings, exterior walls, roof, interior and exterior doors, windows and all existing equipment (e.g. mechanical, communications, electrical systems) and any furnishings within the building. All equipment supporting B13140 shall be removed from B13143 Mechanical Support Building. Facilities shall be inspected and, if found, all Asbestos Containing Materials (ACM) or lead-based paint (LBP) within or on B13140 and B13143, at Vandenberg SFB, CA, shall be removed and properly disposed of. See Attachment 1 - PWS for more information about the requirement. A site visit is scheduled for Monday, June 1, 2026, at 9:00 AM PDT. To participate, you must submit the full names, driver s license numbers, email addresses, and phone numbers for all attendees to Chase French (chase.french@spaceforce.mil) and Rick Porter (rick.porter.1@spaceforce.mil) via email no later than 2:00 PM PDT on May 27, 2026. On the day of the visit, June 1, 2026, all attendees are required to report to the VSFB Visitor Center between 7:20 AM and 8:20 AM to obtain a visitor pass. Due to potential delays at the visitor center, early arrival is strongly encouraged. Please note that the site visit caravan will depart from the Visitor Center promptly at 8:50 AM. Any questions are due no later than 12:00 PM PDT Friday, June 5, 2026. Quotes are due no later than 2:00 PM PDT Friday, June 26, 2026.
From Combined Synopsis/Solicitation posted on Jun 10, 2026Notice history
3-
-
Combined Synopsis/Solicitation Posted Jun 01, 2026View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation LATEST Posted Jun 10, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jun 17, 2026 → Jun 26, 2026