Demolition of Buildings 13140 & 13143 at Vandenberg SFB FA461026_13140
Summary
AI-generated · Mar 19, 2026Demolish Building 13140, a multi-story dormitory, including its slab and foundations, and remove and dispose of all supporting equipment from Building 13143 at Vandenberg SFB. Provide all labor, material, and equipment to complete the demolition, perform abatement of all identified asbestos-containing material (ACM) and lead-based paint (LBP), terminate all associated utilities, and fully restore the site. A draft Performance Work Statement is attached for review.
The project requires the contractor to provide all labor, material, and equipment to completely demolish Building 13140 (a multi-story dormitory), including its slab and foundations. The scope also includes the removal and disposal of all supporting equipment from Building 13143, abatement of all identified Asbestos Containing Material (ACM) and Lead-Based Paint (LBP), termination of all associated utilities, and complete restoration of the site. A draft Performance Work Statement (PWS) is attached for review.
From Sources Sought posted on Mar 18, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA