Demolish and Replace Spring Box 127EAX26Q0001
Summary
AI-generated · Oct 31, 2025Contractor shall provide all labor, materials, tools, testing, supervision, incidentals and permits needed to install a temporary potable water tank, demolish the existing concrete spring box, replace it with a new cast-in-place concrete spring box, and paint the interior with NSF-approved concrete paint (per specifications) as well as the exterior paint per specifications. It also requires providing a qualified third-party coating inspector, sand blasting and powder coating the existing hatches and reinstalling them on the spring box, and installing new shut-off valves and all plumbing connections.
A site visit at the Double Springs Campgrounds is scheduled to review the work site and conditions described in the Statement of Work. Bids must be submitted by the specified deadline.
Site Visit Scheduled for October 23rd at 10:00am at the Double Springs Campgrounds. Location in Statement of Work. Bids Due October 30th by 3:00pm EST. The Contractor shall provide all labor, materials, tools, testing, supervision, incidentals and permits necessary to properly complete the following: Install temporary potable water tank, Demolition of concrete spring box, Replace spring box with new cast in place concrete spring box, Paint spring box with NSF approved concrete paint on interior per specifications and paint per specifications on exterior, Provide a qualified third-party coating inspector, Sand blast and powder coat existing hatches and reinstall on spring box, Install new shut off valves and all plumbing connections.
From Combined Synopsis/Solicitation posted on Oct 30, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA