Demo Phase 18 Tyndall AFB FA481926R0002
Summary
AI-generated · Dec 19, 2025Demolition of three buildings/facilities at Tyndall AFB, Florida, with the contractor responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items needed to complete the tasks described in the SOW. Work will be based on the project description, information in the SOW, and results from a pre-construction/criteria review meeting held before mobilization.
Must comply with a wide range of codes and standards, including UFC 3-250-01 and 3-250-03, UFC 3-600-01, UBC/IBC and the most stringent applicable building codes, Air Force standards, DOD directives, Florida statutes and regulations, FDOT, the Tyndall AFB Facility Excellence Plan, NEC, OSHA, DEP/EPA regulations, and ADA requirements. If conflicts arise, the most stringent requirement applies. Documents provided by the Government are for reference only and do not excuse compliance with applicable codes not explicitly addressed. Perform the work in accordance with the SOW, Construction Wage Rate requirements, and all contract terms.
The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Proposal (RFP) contract site specific demolition of 3 buildings/facilities located on Tyndall AFB, Florida. The Contractor shall adhere to the following guidance during construction phase(s) of this project: Unified Facilities Criteria (UFC) 3-250-01, UFC 3-250-03, UFC 3-600-01, United States Army Corps of Engineers, Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, Air Force Standards, Department of Defense (DOD) Directives, Florida State Statutes, Florida Department of Transportation (FDOT), the Tyndall AFB Facility Excellence Plan (Base Regulations), National Electric Code (NEC), Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and any related Americans with Disabilities Act (ADA) Compliance Requirements. If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. The contractor shall also perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions.
From Solicitation posted on Dec 18, 2025The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Proposal (RFP) contract site specific demolition of 3 buildings/facilities located on Tyndall AFB, Florida. The Contractor shall adhere to the following guidance during construction phase(s) of this project: Unified Facilities Criteria (UFC) 3-250-01, UFC 3-250-03, UFC 3-600-01, United States Army Corps of Engineers, Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, Air Force Standards, Department of Defense (DOD) Directives, Florida State Statutes, Florida Department of Transportation (FDOT), the Tyndall AFB Facility Excellence Plan (Base Regulations), National Electric Code (NEC), Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and any related Americans with Disabilities Act (ADA) Compliance Requirements. If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. The contractor shall also perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions.
From Solicitation posted on Jan 12, 2026The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Proposal (RFP) contract site specific demolition of 3 buildings/facilities located on Tyndall AFB, Florida. The Contractor shall adhere to the following guidance during construction phase(s) of this project: Unified Facilities Criteria (UFC) 3-250-01, UFC 3-250-03, UFC 3-600-01, United States Army Corps of Engineers, Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, Air Force Standards, Department of Defense (DOD) Directives, Florida State Statutes, Florida Department of Transportation (FDOT), the Tyndall AFB Facility Excellence Plan (Base Regulations), National Electric Code (NEC), Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and any related Americans with Disabilities Act (ADA) Compliance Requirements. If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. The contractor shall also perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions.
From Solicitation posted on Jan 29, 2026Notice history
3-
Solicitation Posted Dec 18, 2025
-
Solicitation Posted Jan 12, 2026No changes from previous notice
-
Solicitation LATEST Posted Jan 29, 2026View changes (2)
- Response Deadline: Jan 30, 2026 → Feb 06, 2026
- Set-Aside: HUBZone Sole Source → HUBZone Set Aside
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
32403