Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 4 notices 11 documents

Demo B6142 FA46612526Q0006

Solicitation FA46612526Q0006 Copied Notice ID d5dded729d5a4619b5b12eef5c932d6e Copied DEPT OF DEFENSE — FA4661 7 CONS CD
SAM.gov
Posted
Dec 12, 2025
Deadline
Dec 16, 2025
Set-aside
SBA
NAICS
238910
PSC
P400

Summary

AI-generated · Nov 21, 2025

Demolish Building 6142 in its entirety, approximately 15,275 square feet, down to three feet below existing grade. Include removal of concrete slabs and foundations, sidewalks, drives, utilities, select fill, tops of structural concrete piers and pier caps, reinforcing steel, wood framing, gypsum board, masonry, transite panels, doors and frames, windows, caulking, gypsum and lay-in ceiling grid, floors, carpet, tile, plumbing lines and fixtures, accessories, furniture, insulation, wood and metal framing, HVAC units, ducting and registers, piping, pumps, electrical panels, conduit, wiring, lighting, transformers, gas lines and meters, roofing and flashing, and all related materials and components. The contractor shall furnish all demolition, layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, shoring, fencing, and incidentals and perform all operations in accordance with the attached project drawings and specifications.

Site Visit for this requirement will fall immediately after the Site Visit for Demo B6119 (FA466126Q0005).

Please Advise: The Site Visit for this requirement will fall immediately after the Site Visit for Demo B6119 (FA466126Q0005). Bldg 6142 has an approximate total square footage of 15,275. This project will demolish in its entirety to include concrete slabs and foundations to a depth of three feet below existing grade elevation. This will also include, but not limited to the following: sidewalks, drives, utilities, select fill, tops of structural concrete piers & pier caps, steel reinforcing, wood framing, gypsum board, masonry, transite panels, doors, frames, windows, caulking, gypsum & lay-in ceilings/grid, floors, carpet, tile, plumbing lines & fixtures, accessories, furniture, insulation, wood & metal framing, HVAC units, ducting & registers, piping, pumps, electrical panels, conduit, wiring, lighting, transformers, gas lines & meters, roofing, flashing, etc. The Contractor shall furnish all demolition, layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, shoring, tools, fencing and incidentals and performing all operations in connection with the demolition of Building 6142 in accordance with the attached project drawings and specifications.

From Solicitation posted on Nov 20, 2025

Please Advise: The Site Visit for this requirement will fall immediately after the Site Visit for Demo B6119 (FA466126Q0005). Bldg 6142 has an approximate total square footage of 15,275. This project will demolish in its entirety to include concrete slabs and foundations to a depth of three feet below existing grade elevation. This will also include, but not limited to the following: sidewalks, drives, utilities, select fill, tops of structural concrete piers & pier caps, steel reinforcing, wood framing, gypsum board, masonry, transite panels, doors, frames, windows, caulking, gypsum & lay-in ceilings/grid, floors, carpet, tile, plumbing lines & fixtures, accessories, furniture, insulation, wood & metal framing, HVAC units, ducting & registers, piping, pumps, electrical panels, conduit, wiring, lighting, transformers, gas lines & meters, roofing, flashing, etc. The Contractor shall furnish all demolition, layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, shoring, tools, fencing and incidentals and performing all operations in connection with the demolition of Building 6142 in accordance with the attached project drawings and specifications.

From Solicitation posted on Dec 01, 2025

AMENDMENT #0001 - 11 Dec 2025 The Purpose of this Amendment is to: state a revision to the proposal due date for RFQ B6142, which is now extended to December 16, 2025, at 12:00 PM CST. Furthermore, the corresponding Q&A sheet is now attached & clearer Drawings are attached. Submissions must include a Bid Bond guarantee to be considered. Additionally, in the event of an award, 100% performance & payment bonds are required upon contract execution. The remaining terms & conditions of this RFQ are unaffected by this amendment. END AMENDMENT. Please Advise: The Site Visit for this requirement will fall immediately after the Site Visit for Demo B6119 (FA466126Q0005). Bldg 6142 has an approximate total square footage of 15,275. This project will demolish in its entirety to include concrete slabs and foundations to a depth of three feet below existing grade elevation. This will also include, but not limited to the following: sidewalks, drives, utilities, select fill, tops of structural concrete piers & pier caps, steel reinforcing, wood framing, gypsum board, masonry, transite panels, doors, frames, windows, caulking, gypsum & lay-in ceilings/grid, floors, carpet, tile, plumbing lines & fixtures, accessories, furniture, insulation, wood & metal framing, HVAC units, ducting & registers, piping, pumps, electrical panels, conduit, wiring, lighting, transformers, gas lines & meters, roofing, flashing, etc. The Contractor shall furnish all demolition, layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, shoring, tools, fencing and incidentals and performing all operations in connection with the demolition of Building 6142 in accordance with the attached project drawings and specifications.

From Solicitation posted on Dec 11, 2025

AMENDMENT #0002 - 12 Dec 2025 The purpose of this amendment is to update the requirements for Request for Quotation (RFQ) B6142. Effective immediately, the requirement to submit a Bid Guarantee or Bid Bond with your proposal has been removed. Bidders are no longer required to provide Bonds. The remaining terms & conditions of this RFQ are unaffected by this amendment. END AMENDMENT. AMENDMENT #0001 - 11 Dec 2025 The Purpose of this Amendment is to: state a revision to the proposal due date for RFQ B6142, which is now extended to December 16, 2025, at 12:00 PM CST. Furthermore, the corresponding Q&A sheet is now attached & clearer Drawings are attached. Submissions must include a Bid Bond guarantee to be considered. Additionally, in the event of an award, 100% performance & payment bonds are required upon contract execution. The remaining terms & conditions of this RFQ are unaffected by this amendment. END AMENDMENT. Please Advise: The Site Visit for this requirement will fall immediately after the Site Visit for Demo B6119 (FA466126Q0005). Bldg 6142 has an approximate total square footage of 15,275. This project will demolish in its entirety to include concrete slabs and foundations to a depth of three feet below existing grade elevation. This will also include, but not limited to the following: sidewalks, drives, utilities, select fill, tops of structural concrete piers & pier caps, steel reinforcing, wood framing, gypsum board, masonry, transite panels, doors, frames, windows, caulking, gypsum & lay-in ceilings/grid, floors, carpet, tile, plumbing lines & fixtures, accessories, furniture, insulation, wood & metal framing, HVAC units, ducting & registers, piping, pumps, electrical panels, conduit, wiring, lighting, transformers, gas lines & meters, roofing, flashing, etc. The Contractor shall furnish all demolition, layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, shoring, tools, fencing and incidentals and performing all operations in connection with the demolition of Building 6142 in accordance with the attached project drawings and specifications.

From Solicitation posted on Dec 12, 2025

Notice history

4
  1. Solicitation Posted Nov 20, 2025 View
  2. Solicitation Posted Dec 01, 2025
    No changes from previous notice
  3. Solicitation Posted Dec 11, 2025
    • Description: Description was updated
    • Response Deadline: Dec 12, 2025Dec 16, 2025
  4. Solicitation LATEST Posted Dec 12, 2025
    • Description: Description was updated

Details

Solicitation number FA46612526Q0006
Notice ID d5dded729d5a4619b5b12eef5c932d6e
Notice type Solicitation
Product / Service (PSC) P400
NAICS 238910
Place of performance Dyess AFB, Texas
Archive date Dec 31, 2025

Award Information

Not yet awarded

Contacts

primary
Marshal khinno

Email

Phone

secondary
SrA John G. Craig

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE GLOBAL STRIKE COMMAND
FA4661 7 CONS CD

Place of Performance

Dyess AFB, Texas 79607
USA

Dates

Posted Dec 12, 2025 7 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 16, 2025 7 months ago