Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 7 documents

DCV Gelberman shipyard repairs W912DS26RA020

Solicitation W912DS26RA020 Copied Notice ID 74042c4d0bd941b68ccd2582aea4dd26 Copied DEPT OF DEFENSE — W2SD ENDIST NEW YORK
SAM.gov
Posted
May 28, 2026
Deadline
Jun 05, 2026
Set-aside
SBA
NAICS
336611
PSC
J019

Summary

AI-generated · May 29, 2026

Provide shipyard repair services for the U.S. Drift Collection Vessel Gelberman, furnishing all labor, materials, fittings, equipment, tools, power, heat, and water needed to drydock the vessel, clean and repaint the hull, and perform miscellaneous modifications and repairs in accordance with the specification. Also support ABS and USCG inspections and address requirements of Annual Hull and Machinery Surveys. The contractor is responsible for arranging and paying ABS inspection services. Work must comply with ABS Rules for Building and Classing Steel Vessels and USCG Subchapter I CFR.

All work must be templated from the vessel (reference drawings will be provided, but their accuracy is not verified), and the contractor must provide facilities for moving the vessel’s plant, remove/relocate parts as needed for access (reinstall at contractor’s expense), and repair or replace any damage caused by removal. The project requires coordinating with ABS and USCG inspections and completing the referenced drawings and surveys as part of the scope.

AS OF 28 MAY 2026, AMENDMENT 0002 POSTED. OFFER DUE DATE HAS BEEN EXTENDED TO 05 JUNE 2026 AT 2:00PM EDT. AS OF 27 MAY 2026, AMENDMENT 0001 POSTED. OFFER DUE DATE REMAINS 29 MAY 2026 BY 2:00PM EDT. -------------------------------------------------------------------------------------------- Shipyard repair services for the Drift Collection Vessel Gelberman The work consists of furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc., and performing all work on U.S. Drift Collection Vessel "GELBERMAN" specified herein. The principal dimensions and physical data for the vessel are shown below: GENERAL DESCRIPTION Length Overall............................................... 85'?0" Breadth, Molded............................................ 26'?0" Depth, Molded............................................... 10 -0 Material.......................................................... All Welded Steel Displacement, light........................................ 213 short tons Propellers (2)................................................. 64"Dx52"P, 4 blade Draft, loaded, aft........................................... 8'-6 Hull Form....................................................... Monohull/Keel Coolers ABS I.D. No.................................................. 8004533 The major work scope includes drydocking the vessel, cleaning and painting the hull, assisting with ABS and USCG required inspections, and miscellaneous modifications and repairs in accordance with these specifications. The work scope also includes various items required to satisfy the requirements of Annual Hull and Machinery Surveys. The Contractor shall be responsible for the costs associated with providing the inspection services of ABS[JHA1] [JC2] . Wherever the term "Plant" is used in these specifications, it is understood to refer to the items of floating plant named in this paragraph, together with their normal appurtenances, equipment, and supplies. General vessel arrangements and details are included in the attached file named Reference Drawings[JHA3] [JC4] . The accuracy of these drawings has not been verified. Therefore, the Contractor shall template all work from the vessel. The Contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in his or her possession. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled by the Contractor at his/her expense. Any damage from removal or relocation of parts, equipment, etc. shall be repaired or replaced at the Contractor s expense. The Contractor's work shall comply with ABS "Rules for Building and Classing Steel Vessels" and USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR). [JHA1]When are we paying for al ABS inspections? [JC2]Shipyard handles fees, do we need a NTE Value [JHA3]Gelberman doesn t have a file called Refrence Drawings We need a document or contract section that lays out all of the drawing numbers and titles that are being provided so that we know we have supplied the correct drawings. [JC4]Reference Drawings File is what is posted to Sam.gov it will be a zip file with the drawings we want to include in the solicitation.

From Combined Synopsis/Solicitation posted on May 28, 2026

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted May 28, 2026 View

Details

Solicitation number W912DS26RA020
Notice ID 74042c4d0bd941b68ccd2582aea4dd26
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J019
NAICS 336611
Place of performance Jersey City, New Jersey
Archive date Jul 30, 2026

Award Information

Not yet awarded

Contacts

primary
Monica Coniglio

Email

secondary
Matthew Lubiak

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
ENDIST NEW YORK
W2SD ENDIST NEW YORK

Place of Performance

Jersey City, New Jersey
USA

Dates

Posted May 28, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 05, 2026 2 months ago