DCMA Pease Repair SICG030-25
Summary
AI-generated · Aug 26, 2025Repair and replace drywall damaged by water, replace missing insulation, replace damaged drop ceiling tiles, replace damaged and missing carpet tiles, and repaint walls as directed at the Pease Air National Guard facility. The work involves indoor remediation of water damage using standard construction trades, with painting to match the existing finish as specified.
The two notices are identical, with no change in scope or new requirements indicated between them.
The Defense Contract Management Agency (DCMA) location at the Pease Air National Guard sustained water damaged. The contractor shall repair and replace drywall, replace missing insulation, replace damaged drop ceiling tiles, replace damaged and missing carpet tile and paint walls as directed.
From Combined Synopsis/Solicitation posted on Jun 26, 2025The Defense Contract Management Agency (DCMA) location at the Pease Air National Guard sustained water damaged. The contractor shall repair and replace drywall, replace missing insulation, replace damaged drop ceiling tiles, replace damaged and missing carpet tile and paint walls as directed.
From Combined Synopsis/Solicitation posted on Jul 11, 202508.27.25 - Solicitation has been cancelled in its entirety no award will be made. The Defense Contract Management Agency (DCMA) location at the Pease Air National Guard sustained water damaged. The contractor shall repair and replace drywall, replace missing insulation, replace damaged drop ceiling tiles, replace damaged and missing carpet tile and paint walls as directed.
From Combined Synopsis/Solicitation posted on Aug 27, 2025Notice history
3-
Combined Synopsis/Solicitation Posted Jun 26, 2025
-
Combined Synopsis/Solicitation Posted Jul 11, 2025No changes from previous notice
-
Combined Synopsis/Solicitation LATEST Posted Aug 27, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Documents
7Contacts
Phone
Agency
Place of Performance
USA