Dam Valve Replacement/Repair for the Hoosier National Forest 12444526Q0013
Summary
AI-generated · Mar 09, 2026Replace the dam valve assemblies at Celina Lake and Saddle Lake dams and repair the valve assembly at U-38 dam on the Hoosier National Forest. The three earthen dams on the Tell City Ranger District each have different existing valve systems, and attachments provide the known equipment and diagrams for each dam to inform bidding; maps show the locations.
As-built drawings can be obtained on request. Review the attachments for the specific valve configurations and required work at each dam to prepare your proposal.
The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in attachments to this solicitation. A copy of the as-builts can be acquired upon request. The scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest
From Combined Synopsis/Solicitation posted on Mar 06, 2026The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in attachments to this solicitation. A copy of the as-builts can be acquired upon request. The scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest
From Combined Synopsis/Solicitation posted on Mar 10, 2026The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in attachments to this solicitation. A copy of the as-builts can be acquired upon request. The scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest
From Combined Synopsis/Solicitation posted on Mar 19, 2026The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in attachments to this solicitation. A copy of the as-builts can be acquired upon request. The scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest
From Combined Synopsis/Solicitation posted on Mar 23, 2026Notice history
4-
Combined Synopsis/Solicitation Posted Mar 06, 2026
-
Combined Synopsis/Solicitation Posted Mar 10, 2026View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation Posted Mar 19, 2026View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation LATEST Posted Mar 23, 2026View changes (1)
- Response Deadline: Apr 03, 2026 → Apr 17, 2026
Details
Award Information
Not yet awarded
Documents
9Contacts
Phone
Agency
Place of Performance
USA