Culvert Replacement Meadow Creek 1240LT25Q0054
Summary
AI-generated · Sep 28, 2025Replace a failed culvert at Meadow Creek on West Dolores Road (NFSR 535) at milepost 24.72, just past Burro Bridge. The 72-inch diameter pipe is to be replaced with a steel, polycoated culvert designed to resist rust from the mineral-rich stream water. A bypass road will be constructed to maintain traffic during the approximately two-week project.
Rip-rap will be collected on-site, and road base may be used for surfacing; other surfacing materials will be commercially purchased minus road base. A site visit will be held to discuss requirements; refer to Section L and the attached SOW, specifications, and drawings for full project details.
A Site Visit will be held on 10-3-2025 at 1:00pm MT. Refer to Solicitation Section L for full details and requirements. The culvert at Meadow Creek has failed and is need of replacement. This is in a live stream (meadow creek) and the water is creating a void under the road as it erodes causing the road to settle and create a hazardous situation. The 72 diameter pipe is located on the West Dolores Road (NFSR 535) at milepost 24.72 just past burro bridge. The objective is to replace the pipe with a steel polycoated culvert that will resist rusting from the mineral content in the stream. A bypass road will be constructed to allow continued traffic throughout the duration of the project which is anticipated to last two weeks. Rip-rap will be collected on-site and commercially purchased -minus road base will be used for surfacing. See attached SOW, Specs, and Drawings for full project Requirements
From Solicitation posted on Sep 23, 202510-2-2025 - UPDATE - Site Visit is hereby CANCELED A new date will be esatblished once the Government Shutdown concludes. The culvert at Meadow Creek has failed and is need of replacement. This is in a live stream (meadow creek) and the water is creating a void under the road as it erodes causing the road to settle and create a hazardous situation. The 72 diameter pipe is located on the West Dolores Road (NFSR 535) at milepost 24.72 just past burro bridge. The objective is to replace the pipe with a steel polycoated culvert that will resist rusting from the mineral content in the stream. A bypass road will be constructed to allow continued traffic throughout the duration of the project which is anticipated to last two weeks. Rip-rap will be collected on-site and commercially purchased -minus road base will be used for surfacing. See attached SOW, Specs, and Drawings for full project Requirements
From Solicitation posted on Oct 02, 2025Notice history
2-
Solicitation Posted Sep 23, 2025
-
Solicitation LATEST Posted Oct 02, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Oct 20, 2025 → Oct 30, 2025