CTX Boiler Plant Heater Install 36C25725Q0827
Summary
AI-generated · Aug 26, 2025Contractor shall provide all labor, supervision, material, and equipment for the Building 58 Heater Install at the Temple Boiler Plant, excluding six 208V electric heaters that will be provided by the VA. Install but not limited to conduit, electrical wiring, breakers, switches, thermostats, hanging materials, etc., and install the VA-provided 208V heaters for comfort. Maintain a clean work site with daily trash and debris disposal and ensure operations at the boiler plant are not impeded.
An amendment cancels solicitation 36C25725Q0827 per the facility's request.
Project Requirements: The Contractor shall provide all labor, supervision, material, and equipment, excluding (6) 208v electric heaters, for The Building 58 Heater Install at the Temple Boiler Plant. The Contractor shall install but not limited to, conduit, electrical wiring, breakers, switches, thermostats, hanging materials. Etc. The Contractor shall Install VA provided 208v electric heaters for comfort. 4.The Contractor shall clean work site and discard all trash and debris daily. 5.The Contractor shall not impede with daily boiler plant operations.
From Solicitation posted on Aug 12, 2025This amendment is to cancel solicitation 36C25725Q0827 per the facility's request.
From Special Notice posted on Aug 25, 2025Notice history
2-
-
Special Notice LATEST Posted Aug 25, 2025View changes (2)
- Description: Description was updated
- Notice Type: Solicitation → Special Notice
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA