Crystal Lakes Work Center Waterline Improvements 1240LT25R0025
Summary
AI-generated · Aug 24, 2025Install a new waterline at Crystal Lakes Work Center to supply potable water from a second, higher-quality source. The contractor must provide all labor, materials, transportation, and other required tasks in accordance with the Statement of Work, drawings, and specifications, with a site visit scheduled to review requirements. Full project details are in the attached documents.
Amendments to the solicitation have updated the proposal due date, added an additional site visit, answered questions, and incorporated required attachments. The site visit details are referenced in the solicitation (Page 3).
The Crystal Lakes Work Center is located in the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands in the Leadville Ranger District. The contractor is responsible for providing all labor, materials, transportation and all other required taks to install a new waterline in order to provide the Work Center with potable and drinking water from a second source with higher quality water all in accordance with the Statement of Work, drawings, and aplicable specifications. See attached documents for full project description and requirements. NOTE: A Site Visit will be held on July 10th, 2025. Refer to Page 3 of the Solicitation for details and requirements.
From Solicitation posted on Jul 01, 20257-21-2025 - Amendment 0001 - The reason for Amendment 0001 is to update Proposal due date, provide an additional site visit, address a question and answer. See Attached A0001 for details The Crystal Lakes Work Center is located in the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands in the Leadville Ranger District. The contractor is responsible for providing all labor, materials, transportation and all other required taks to install a new waterline in order to provide the Work Center with potable and drinking water from a second source with higher quality water all in accordance with the Statement of Work, drawings, and aplicable specifications. See attached documents for full project description and requirements. NOTE: A Site Visit will be held on July 10th, 2025. Refer to Page 3 of the Solicitation for details and requirements.
From Solicitation posted on Jul 21, 20257-30-2025 - Amendment 002 - The purpose of Amendment 0002 is to update proposal due date, provide questions and answers, and incorporate attachments as requried. Refer to A0002 for full details. 7-21-2025 - Amendment 0001 - The reason for Amendment 0001 is to update Proposal due date, provide an additional site visit, address a question and answer. See Attached A0001 for details The Crystal Lakes Work Center is located in the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands in the Leadville Ranger District. The contractor is responsible for providing all labor, materials, transportation and all other required taks to install a new waterline in order to provide the Work Center with potable and drinking water from a second source with higher quality water all in accordance with the Statement of Work, drawings, and aplicable specifications. See attached documents for full project description and requirements. NOTE: A Site Visit will be held on July 10th, 2025. Refer to Page 3 of the Solicitation for details and requirements.
From Solicitation posted on Jul 30, 2025Notice history
3-
Solicitation Posted Jul 01, 2025
-
Solicitation Posted Jul 21, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 31, 2025 → Aug 05, 2025
-
Solicitation LATEST Posted Jul 30, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 05, 2025 → Aug 12, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA