Crystal Lakes Work Center Waterline Improvements 1153530
Summary
AI-generated · Aug 25, 2025Perform all requirements, including producing a Subsurface Utility Engineering (SUE) study, to obtain a Colorado Department of Transportation permit to bore a 2-inch HDPE (SDR-11) waterline under Highway 24. Install approximately 900 feet of 2-inch SDR11 HDPE from the basement of Dwelling 1 to the existing east-side water distribution on HWY 24, and install the necessary pipe and fittings to connect to the existing water treatment system in the basement of Dwelling 1 on the west side, with a tee, curb stops, and adapters to connect to the east-side distribution; the new water distribution line must be at least 10 feet below grade.
Remove and replace the well pump to attain 15 GPM for Dwelling 1, connect the pump to the existing electrical supply and control panel, and provide a level sensor in the storage tank to energize the pump. Decommission the well on the east side of the highway in accordance with Colorado regulations and decommission/abandon the pressure tank and east-side water distribution system. Perform a static pressure test and disinfection of the new infrastructure per specification requirements. A site visit is scheduled; details are in the pre-solicitation/synopsis.
PROJECT: Crystal Lakes Waterline Improvements *********READ the Pre-Soliciation Notice /Synopsis in its entirey. This document is located in the Attachments/Links. Details for the Site Visit scheduled for July 2025 are included in the Pre-solicitation/Synopsis. **************** Description of Work: The SOW (Statement of Work) will be posted with the upcoming anticipated Solicitation. The work generally consists of the following: A. Perform all requirements (including producing a Subsurface Utility Engineering (SUE)) to attain a permit from the Colorado Department of Transportation to bore a 2-inch HDPE (SDR-11) waterline under Colorado HWY 24. B. Install approximately 900 feet of 2-inch SDR11 HDPE water pipe from the basement of Dwelling 1 to the existing 2-inch schedule 40 PVC water distribution system located on the East side of HWY 24. C. Install necessary pipe and fittings including valves and adapters to connect to the existing water treatment system located in the basement of DWELLING 1 on the West Side of HWY 24. D. Install necessary pipe and fittings including a tee, curb stops, and adapters to connect to the existing water distribution system located on the East Side of HWY 24. E. The water distribution system shall be installed at a minimum depth of 10 feet below grade. F. Removal of existing well pump and installation of a new Well pump to attain 15 GPM supply flowrate to Dwelling 1. G. Connect well pump to existing electrical supply and control panel, provide level sensor in water storage tank to energize well pump on and off. H. Decommission well on East side of Highway in accordance with State of Colorado regulations. I. Decommission and abandon pressure tank and water distribution system from the well located on the East side of Colorado HWY 24. J. Perform a static pressure test and disinfection of new infrastructure per specification requirements.
From Presolicitation posted on Jun 16, 2025Notice history
1-
Presolicitation LATEST Posted Jun 16, 2025
Details
Award Information
Not yet awarded