Contacts, documents and full notice history are available with a subscription.
Special Notice SBA Expired 1 notice

CRG PACE Heater Sources Sought F3A1AM01

Solicitation F3A1AM01 Copied Notice ID 27bbecd51b70482389598d00a92f9f89 Copied DEPT OF DEFENSE — DEPT OF THE AIR FORCE
SAM.gov
Posted
Jun 05, 2026
Deadline
Jun 15, 2026
Set-aside
SBA
NAICS
23822
PSC
1660

Summary

AI-generated · Jun 06, 2026

Procurement seeks 14 UTS HH75 heaters to provide rapid, global deployment heating for contingency response operations, including arctic and sub-arctic locations. The goal is a light, lean, and agile capability that can outperform current environmental control units (ECUs) in extreme cold, reducing generator load and fuel use. The heater is multi-fueled (DF1, DF2, JP5, JP8, and kerosene), with kerosene enabling operation down to about -50F, and runtime estimates showing a full 11.6-gallon tank can sustain heating for approximately 22 hours.

Delivery and installation of the equipment with standard manufacturer warranty is required; responsibility for ongoing maintenance and accountability shifts to the CRG AGE/Electrical Power Production Work Center during operations, while the 621st Contingency Response Wing will use the units on base and at deployed locations for deployments, training, and exercises. Equipment specifications include 75,000 BTU/hr heat output, dimensions of 44.0 L x 16.4 W x 25.0 H inches, 11.6-gallon tank, continuous-use fuel consumption of 0.53 gallons per hour, and power needs of 120 VAC, 60 Hz, single phase, 3 Amps. Included accessories are an exhaust stack, two heater ducts, a remote thermostat, and an O&M manual.

1. General: The CRG requires rapid deployment capabilities across the globe with equipment suitable for sustainment of operations. Current assets do not meet arctic and sub-arctic requirements for reliant heating for personnel and equipment in the field. UTS is the sole provider for a heating solution feasible for a light and lean approach. Through procurement of 14 UTS HH75 Heaters, it will satisfy the gap we face for locations reaching below -10F and reinforce our global prowess. 2. Objectives: The 621 CRG needs a capability that enables its force elements to operate in any AOR, including arctic and sub-arctic conditions while remaining light, lean, and agile; the UTS HH75 Heater is essential to this capability since it outperforms the current heating capability of the Environmental Control Unit (ECU). The UTS 5-ton Environmental Control Unit (ECU) meets most theater requirements for operating limitations. The main limitation is ambient operating temperatures of -25 to 125F. To meet arctic and sub-arctic conditions the need for the UTS HH75 Heater is paramount. The Heater is multi-fueled (DF1, DF2, JP5, JP8, Kerosene). Ambient operating temperature is based off the fuel utilized. Kerosene used as fuel for the Heater opens the door to temperatures as low as -50F. In colder environments, the ECU will push at most, 12Kw (40,000 BTU/hr) of heat. The 12Kw also translates to load on the generator which increases fuel consumption dramatically. Dependent on set-up, the generator would utilize about 4 gal an hour due to the ECUs maxing out. The UTS HH75 Heater would pull only 3Amps for the electronic controls and mainly rely on its 11.6gal fuel tank. Under continuous use, it would pull .53 gal per hour. A full tank would sustain heating needs for 22 hours. 3. Scope of Work: This equipment will be used for the 621st Contingency Response Wing 621 CRW operations, on base and various locations for deployments, training, and exercises. The vendor will provide and deliver the equipment with standard manufacturer warranty to meet global availability for contingency forces to include arctic and sub-arctic regions. The 621 CRW will be responsible for maintaining the accountability and maintenance of the equipment past the warranty period. 4. Personnel: The vendor will provide delivery of this item. The maintenance, accountability, and operations of this equipment will be the responsibility of the CRG AGE/Electrical Power Production Work Center. 5. Equipment Requirements and peripheral shall meet or exceed the specs of: Heat Output: 75,000 BTU/H Dimensions: 44.0 L x 16.4 W x 25.0 H Tank Capacity: 11.6 Gallons Fuel Consumption under Continuous Use: 0.53 gallons per hour Fuel Requirements: DF1, DF2, JP5, JP8, and Kerosene Power Requirements: 120 VAC, 60 Hz, Single Phase Power Usage: 3 Amps @120V Accessories Included: Exhaust Stack, Heater Ducts (2), Remote Thermostat, O&M Manual

From Special Notice posted on Jun 05, 2026

Notice history

1
  1. Special Notice LATEST Posted Jun 05, 2026 View

Details

Solicitation number F3A1AM01
Notice ID 27bbecd51b70482389598d00a92f9f89
Notice type Special Notice
Product / Service (PSC) 1660
NAICS 23822
Place of performance CAPE MAY CH, New Jersey
Archive date Jun 30, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Logan Turner

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE

Place of Performance

CAPE MAY CH, New Jersey 08641
USA

Dates

Posted Jun 05, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 15, 2026 1 month ago