Cottonwood Pile Dike Repairs W9127N26BA005CottonwoodPileDikeRepairs-Solicitation
Summary
AI-generated · Apr 02, 2026Cottonwood Pile Dike Repairs require focused repairs to select sections of pile dikes along the Lower Columbia River between River Miles 68 and 72 in Cowlitz County, WA. The work targets areas where piles are largely missing or no longer visible, compromising hydraulic function, and includes enrockment repair/enhancement at ten pile dikes and a shore connection with an offset pile dike at five of the pile dikes. Offsets are designed to allow rock placement without removing piles, and all debris within rock placement areas must be removed before stone placement and disposed of at an approved upland facility, with debris-removal requirements based on pre-construction high-resolution multibeam bathymetric survey data.
This is an Invitation for Bid for a single fixed-price contract, awarded to the lowest priced, responsible, and responsive bidder. NEPA review, including a Finding of No Significant Impact, is expected to be completed by the end of May 2026, and award will not be made until NEPA is complete. Bids must be submitted by email to the designated points of contact; the government reserves the right to cancel the solicitation at any time.
W9127N26BA005 Cottonwood Pile Dike Repairs The project is located between River Mile 68 and River Mile 72 on the Lower Columbia River in Cowlitz County, Washington. The project allows for focused, cost-effective repairs to select sections of individual structures. Repair areas are limited to sections of pile dikes that have experienced loss of all, or the majority of, visible piles to the extent that hydraulic function is assumed to be severely compromised. The work includes enrockment repair/enhancement areas at ten pile dikes and a shore connection with an offset pile dike at five of the pile dikes. The offset pile dikes and shore connection are in areas where there is visual evidence of shoreline erosion and a lack of sufficient remnant shore connection and the potential for additional erosion exists. The enrockment repair/enhancement sections in repair areas are offset a sufficient distance from the existing pile line to allow for placement of stone without removal of any pile. All debris within the rock placement areas that would interfere with stone placement shall be removed prior to stone placement. Debris will be removed from the site and disposed of at an approved upland facility. Debris removal requirements will be based on pre-construction high resolution multi-beam bathymetric survey data. This solicitation is an Invitation for Bid (IFB). Award will be made to the lowest priced, responsible, and responsive offeror. This acquisition will result in a single fixed-price contract. The National Environmental Policy Act (NEPA) process, including the signed Finding of No Significant Impact (FONSI), is anticipated to be completed by the end of May 2026; award will not be made until the NEPA process has completed. This is a Total Small Business Set-Aside. The North American Industrial Classification Code (NAICS) for this requirement is 237990 Other Heavy and Civil Engineering Construction . The related size standard is $45.0 million. The PSC is Z2QA Repair or Alteration of Restoration of Real Property (Public or Private). The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Chris Burroughs at christopher.d.burroughs@usace.army.mil, and the alternate POC, Justin Figueredo at justin.f.figueredo@usace.army.mil. E-mail is the only method for receiving bids to this Solicitation. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.
From Solicitation posted on Apr 01, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA